ITAC Assessment: MI0455
ITAC logo
ITAC Assessment: MI0455
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Aluminum Extrusion / Mill Finish
NAICS 331318: Other Aluminum Rolling, Drawing, and Extruding
SIC 3354: Aluminum Extruded Products
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 423,916
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $449,543 2,120,978
kWh
Electricity Demand $108,095 9,444
kW-mo/yr
Electricity Fees $5,400 -
TOTAL YEARLY COSTS $563,037
RECOMMENDED SAVINGS* $115,979 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.3212: Optimize plant power factor $46,100 $45,007 - $46,100
-
kW-mo/yr
-
02 2.8114: Change rate schedules or other changes in utility service $24,930 $3,200 - - $24,930
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $20,861 $35,685 $18,698
88,200
kWh
$2,163
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,287 $1,620 $12,068
56,923
kWh
$5,219
-
kW-mo/yr
-
05 2.4239: Eliminate or reduce compressed air usage $5,478 $80 $4,887
23,051
kWh
$591
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $1,323 $1,578 $1,323
6,240
kWh
- -
TOTAL RECOMMENDED $115,979 $87,170 $36,976
174,414
kWh
$54,073
-
kW-mo/yr
$24,930
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs