ITAC Assessment: KU0418
ITAC logo
ITAC Assessment: KU0418
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product I.D. Bracelets and Medical Products
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area 57,000
ft2
Annual Production 14,000,000
pieces
Production Hrs. Annual 2,475
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $123,540 1,884,818
kWh
Natural Gas $2,600 580
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,400 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,422

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,404 $8,420 $6,404
70,926
kWh
02 2.7135: Install occupancy sensors $1,191 $1,300 $1,191
18,171
kWh
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,422 $2,228 $1,422
21,688
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $711 $668 $711
10,844
kWh
05 2.2212: Use minimum safe oven ventilation $538 - $538
8,206
kWh
06 2.2511: Insulate bare equipment $134 $293 $134
2,052
kWh
TOTAL RECOMMENDED $10,400 $12,909 $10,400
131,887
kWh
TOTAL IMPLEMENTED $1,422 $2,228 $1,422
21,688
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs