ITAC Assessment: SF0451
ITAC logo
ITAC Assessment: SF0451
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 39
Plant Area 2,307,000
ft2
Annual Production 11,468,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,429,846 29,714,754
kWh
Electricity Demand $620,520 47,617
kW-mo/yr
Natural Gas $92,340 10,882
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $111,351 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $67,946

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7224: Reduce space conditioning during non-working hours $24,113 - $24,113
460,269
kWh
-
02 2.6218: Turn off equipment when not in use $11,085 - $8,086
168,042
kWh
$2,999
-
kW-mo/yr
03 3.7212: Improved material handling (mixing and transfer) $37,183 $15,000 $27,122
563,637
kWh
$10,061
-
kW-mo/yr
04 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation $2,957 $1,853 $2,157
44,820
kWh
$800
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $29,791 $53,490 $21,265
441,918
kWh
$8,526
-
kW-mo/yr
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,422 $6,599 $1,853
38,512
kWh
$569
-
kW-mo/yr
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,800 $12,734 $2,772
57,600
kWh
$1,028
-
kW-mo/yr
TOTAL RECOMMENDED $111,351 $89,676 $87,368
1,774,798
kWh
$23,983
-
kW-mo/yr
TOTAL IMPLEMENTED $67,946 $55,343 $55,621
1,115,049
kWh
$12,325
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs