| Assessment Year | 2014 |
|---|---|
| Principal Product | Treated Wastewater |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $10 M to 50M |
| # of Employees | 39 |
| Plant Area |
2,307,000
ft2
|
| Annual Production | 11,468,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,429,846 | 29,714,754 |
kWh
|
$0.048 |
| Electricity Demand | $620,520 | 47,617 |
kW-mo/yr
|
$13.03 |
| Natural Gas | $92,340 | 10,882 |
MMBtu
|
$8.49 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $111,351 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $67,946 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7224: Reduce space conditioning during non-working hours | $24,113 | - |
$24,113
460,269
kWh
|
- | |
| 02 | 2.6218: Turn off equipment when not in use | $11,085 | - |
$8,086
168,042
kWh
|
$2,999
-
kW-mo/yr
|
|
| 03 | 3.7212: Improved material handling (mixing and transfer) | $37,183 | $15,000 |
$27,122
563,637
kWh
|
$10,061
-
kW-mo/yr
|
|
| 04 | 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation | $2,957 | $1,853 |
$2,157
44,820
kWh
|
$800
-
kW-mo/yr
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $29,791 | $53,490 |
$21,265
441,918
kWh
|
$8,526
-
kW-mo/yr
|
|
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,422 | $6,599 |
$1,853
38,512
kWh
|
$569
-
kW-mo/yr
|
|
| 07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,800 | $12,734 |
$2,772
57,600
kWh
|
$1,028
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $111,351 | $89,676 |
$87,368
1,774,798
kWh
|
$23,983
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $67,946 | $55,343 |
$55,621
1,115,049
kWh
|
$12,325
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs