Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Processing of steel bars
NAICS
n/a
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 15
Plant Area 52,000
ft2
Annual Production 0
units
Production Hrs. Annual 7,200
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,197 591,442
kWh
Natural Gas $195,980 60,972
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,251 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,209

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $1,209 $1,167 $1,209
11,137
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,758 $5,594 $2,758
25,498
kWh
-
03 2.3212: Optimize plant power factor $1,047 $2,160 $1,047
-
kWh
-
04 2.1122: Re-size charging openings or add a movable door on equipment $28,057 $1,600 - $28,057
-
MMBtu
05 2.2414: Use waste heat from hot flue gases to preheat $13,180 $8,000 - $13,180
-
MMBtu
TOTAL RECOMMENDED $46,251 $18,521 $5,014
36,635
kWh
$41,237
-
MMBtu
TOTAL IMPLEMENTED $1,209 $1,167 $1,209
11,137
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs