ITAC Assessment: SU0514
ITAC logo
ITAC Assessment: SU0514
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Wire and Cable
NAICS 333318: Other Commercial and Service Industry Machinery Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 83
Plant Area 144,000
ft2
Annual Production 55,330,518
lb
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $636,066 14,447,552
kWh
Electricity Demand $454,322 41,940
kW-mo/yr
Electricity Fees $60,092 -
Natural Gas $62,720 12,079
MMBtu
TOTAL YEARLY COSTS $1,213,200
RECOMMENDED SAVINGS* $57,473 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $9,008 - $9,008
204,723
kWh
- - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $22,430 $675 - $22,430
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,219 $1,953 $4,219
95,882
kWh
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $18,996 $9,943 $18,996
431,747
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $46 $49 $19
438
kWh
$6
-
kW-mo/yr
$21 -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,774 $3,179 $1,607
36,517
kWh
$692
-
kW-mo/yr
- $475
TOTAL RECOMMENDED $57,473 $15,799 $33,849
769,307
kWh
$23,128
-
kW-mo/yr
$21 $475
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs