Assessment Year | 2022 |
---|---|
Principal Product | Wire and Cable |
NAICS | 333318: Other Commercial and Service Industry Machinery Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 83 |
Plant Area |
144,000
ft2
|
Annual Production | 55,330,518
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $636,066 | 14,447,552 |
kWh
|
$0.044 |
Electricity Demand | $454,322 | 41,940 |
kW-mo/yr
|
$10.83 |
Electricity Fees | $60,092 | - |
|
- |
Natural Gas | $62,720 | 12,079 |
MMBtu
|
$5.19 |
TOTAL YEARLY COSTS | $1,213,200 | |||
RECOMMENDED SAVINGS* | $57,473 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,008 | - |
$9,008
204,723
kWh
|
- | - | - | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $22,430 | $675 | - |
$22,430
-
kW-mo/yr
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,219 | $1,953 |
$4,219
95,882
kWh
|
- | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $18,996 | $9,943 |
$18,996
431,747
kWh
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $46 | $49 |
$19
438
kWh
|
$6
-
kW-mo/yr
|
$21 | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,774 | $3,179 |
$1,607
36,517
kWh
|
$692
-
kW-mo/yr
|
- | $475 | |
TOTAL RECOMMENDED | $57,473 | $15,799 |
$33,849
769,307
kWh
|
$23,128
-
kW-mo/yr
|
$21 | $475 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs