| Assessment Year | 2023 |
|---|---|
| Principal Product | Aluminum Extrusions |
| NAICS | 331318: Other Aluminum Rolling, Drawing, and Extruding |
| SIC | 3354: Aluminum Extruded Products |
| Sales Range | $50 M to 100M |
| # of Employees | 165 |
| Plant Area |
150,000
ft2
|
| Annual Production | 37,068,142
units
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $869,031 | 8,686,123 |
kWh
|
$0.10 |
| Natural Gas | $434,665 | 67,475 |
MMBtu
|
$6.44 |
| TOTAL YEARLY COSTS | $1,303,696 | |||
| RECOMMENDED SAVINGS* | $323,753 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $77,908 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.8121: Apply for tax-free status for energy purchases | $23,763 | $800 | - | $23,763 | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $48,377 | $1,850 |
$51,277
512,766
kWh
|
- | $(-2,900.0) | |
| 03 | 2.7224: Reduce space conditioning during non-working hours | $4,800 | $1,000 |
$4,800
47,800
kWh
|
- | - | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $968 | $576 |
$968
9,681
kWh
|
- | - | |
| 05 | 2.4323: Use optimum size and capacity equipment | $5,843 | $24,000 |
$5,843
58,429
kWh
|
- | - | |
| 06 | 2.9114: Use solar heat to make electricty | $237,120 | $2,593,008 |
$237,120
2,370,049
kWh
|
- | - | |
| 07 | 2.3212: Optimize plant power factor | $2,881 | $13,403 | - | $2,881 | - | |
| TOTAL RECOMMENDED | $323,753 | $2,634,637 |
$300,008
2,998,725
kWh
|
$26,644 | $(-2,900.0) | ||
| TOTAL IMPLEMENTED | $77,908 | $4,226 |
$57,045
570,247
kWh
|
$23,763 | $(-2,900.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs