ITAC Assessment: NC0067
ITAC logo
ITAC Assessment: NC0067
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Corrugated Boxes
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 136
Plant Area 231,000
ft2
Annual Production 6,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $309,190 5,580,305
kWh
Natural Gas $181,661 43,283
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,499 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,123

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,790 $360 $1,790
44,256
kWh
- -
02 2.4133: Use most efficient type of electric motors $1,315 $1,122 $1,315
26,671
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,692 $919 $3,692
74,736
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $618 $680 $618
11,430
kWh
- -
05 2.7447: Install vinyl strip / high speed / air curtain doors $9,392 $45,000 $(-397.0)
(-6,741)
kWh
$9,789
-
MMBtu
-
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,162 - $1,162
-
kWh
- -
07 2.7314: Reduce ventilation air $21,249 $25,000 - $21,249
-
MMBtu
-
08 2.7491: Insulate glazing, walls, ceilings, and roofs $9,347 $34,448 - $9,347
-
MMBtu
-
09 2.1233: Analyze flue gas for proper air/fuel ratio $2,713 $600 - $2,713
-
MMBtu
-
10 3.5316: Contract a wood pallet recycling company $200 $100 - - $200
-
lb
11 3.5313: Increase amount of waste recovered for resale $21 $100 - - $21
-
lb
TOTAL RECOMMENDED $51,499 $108,329 $8,180
150,352
kWh
$43,098
-
MMBtu
$221
-
lb
TOTAL IMPLEMENTED $19,123 $48,201 $6,400
138,922
kWh
$12,502
-
MMBtu
$221
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs