| Assessment Year | 2024 |
|---|---|
| Principal Product | Extruded Metal Parts |
| NAICS | 331318: Other Aluminum Rolling, Drawing, and Extruding |
| SIC | 3354: Aluminum Extruded Products |
| Sales Range | $100 M to 500M |
| # of Employees | 230 |
| Plant Area |
788,000
ft2
|
| Annual Production | 6,000,000
lb
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $3,316,912 | 42,911,700 |
kWh
|
$0.077 | |
| Electricity Demand | $963,574 | 42,869 |
kW-mo/yr
|
$22.48 | |
| Electricity Fees | $137,593 | - |
|
- | |
| Natural Gas | $1,404,483 | 396,929 |
MMBtu
|
$3.54 | |
| Waste Disposal Costs | |||||
| Water Usage | $242,483 | 36,740 |
Tgal
|
$6.60 | |
| TOTAL YEARLY COSTS | $6,065,043 | ||||
| RECOMMENDED SAVINGS* | $397,434 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $142,157 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,160 | $5,609 |
$6,931
89,664
kWh
|
$3,229
-
kW-mo/yr
|
- | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $22,341 | - |
$15,238
197,128
kWh
|
$7,103
-
kW-mo/yr
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $109,656 | $54,987 |
$74,798
967,629
kWh
|
$34,858
-
kW-mo/yr
|
- | |
| 04 | 2.3212: Optimize plant power factor | $122,072 | $90,330 | - | - | $122,072 | |
| 05 | 4.812: Apply for investment incentives | $133,205 | - | - | - | $133,205 | |
| TOTAL RECOMMENDED | $397,434 | $150,926 |
$96,967
1,254,421
kWh
|
$45,190
-
kW-mo/yr
|
$255,277 | ||
| TOTAL IMPLEMENTED | $142,157 | $60,596 |
$96,967
1,254,421
kWh
|
$45,190
-
kW-mo/yr
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs