ITAC Assessment: NT0026
ITAC logo
ITAC Assessment: NT0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Extruded Metal Parts
NAICS 331318: Other Aluminum Rolling, Drawing, and Extruding
SIC 3354: Aluminum Extruded Products
Sales Range $100
M
to 500
M
# of Employees 230
Plant Area 788,000
ft2
Annual Production 6,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,316,912 42,911,700
kWh
Electricity Demand $963,574 42,869
kW-mo/yr
Electricity Fees $137,593 -
Natural Gas $1,404,483 396,929
MMBtu
Waste Disposal Costs
Water Usage $242,483 36,740
Tgal
TOTAL YEARLY COSTS $6,065,043
RECOMMENDED SAVINGS* $397,434 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,160 $5,609 $6,931
89,664
kWh
$3,229
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $22,341 - $15,238
197,128
kWh
$7,103
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $109,656 $54,987 $74,798
967,629
kWh
$34,858
-
kW-mo/yr
-
04 2.3212: Optimize plant power factor $122,072 $90,330 - - $122,072
05 4.812: Apply for investment incentives $133,205 - - - $133,205
TOTAL RECOMMENDED $397,434 $150,926 $96,967
1,254,421
kWh
$45,190
-
kW-mo/yr
$255,277
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs