ITAC Assessment: CO0693
ITAC logo
ITAC Assessment: CO0693
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Electronic identification equipment
NAICS 334220: Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing
SIC 3663: Radio and Television Broadcasting and Communications Equipment
Sales Range $100
M
to 500
M
# of Employees 120
Plant Area 72,500
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New Mexico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $146,370 2,388,000
kWh
Electricity Demand $142 5,130
kW-mo/yr
Electricity Fees $90,056 -
Natural Gas $10,001 1,358
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,780 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,840

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,130 $570 $5,130
78,400
kWh
- - -
02 2.7232: Replace existing hvac unit with high efficiency model $9,940 $6,400 $9,940
136,900
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $8,450 $50,000 $8,930
126,600
kWh
$240 - $(-720.0)
04 2.8121: Apply for tax-free status for energy purchases $5,260 $1,250 - - $5,260 -
TOTAL RECOMMENDED $28,780 $58,220 $24,000
341,900
kWh
$240 $5,260 $(-720.0)
TOTAL IMPLEMENTED $18,840 $51,820 $14,060
205,000
kWh
$240 $5,260 $(-720.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs