ITAC Assessment: OD0084
ITAC logo
ITAC Assessment: OD0084
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Magazines and books
NAICS
n/a
SIC 2732: Book Printing
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 136,000
ft2
Annual Production 71,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $362,136 9,287,222
kWh
Electricity Demand $171,106 20,475
kW-mo/yr
Electricity Fees $345 -
Natural Gas $112,078 19,552
MMBtu
LPG $114,334 17,813
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,277 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,492

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Water Disposal Savings Other Liquid (haz) Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,338 $25,270 $7,998
205,158
kWh
- $4,340
-
MMBtu
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $818 $589 $818
21,102
kWh
- - - -
03 2.4234: Cool compressor air intake with heat exchanger $1,617 $4,378 $1,111
28,429
kWh
$506
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,487 $1,724 $1,096
28,136
kWh
$391
-
kW-mo/yr
- - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $1,624 $1,495 - - $1,624
-
MMBtu
- -
06 2.4323: Use optimum size and capacity equipment $4,546 $1,110 $3,351
85,873
kWh
$1,195
-
kW-mo/yr
- - -
07 3.6124: Burn waste oil for heat $2,284 $3,402 $(-146.0)
(-3,810)
kWh
$(-57.0)
-
kW-mo/yr
- - $2,487
-
gal
08 3.4114: Replace city water with recycled water via cooling tower $28,563 $11,432 $(-524.0)
(-13,482)
kWh
$(-187.0)
-
kW-mo/yr
- $29,274
-
Tgal
-
TOTAL RECOMMENDED $53,277 $49,400 $13,704
351,406
kWh
$1,848
-
kW-mo/yr
$5,964
-
MMBtu
$29,274
-
Tgal
$2,487
-
gal
TOTAL IMPLEMENTED $32,492 $15,240 $1,390
35,756
kWh
$204
-
kW-mo/yr
$1,624
-
MMBtu
$29,274
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Water Disposal Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs