ITAC Assessment: LT0073
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product BALL BEARING ASSEMBLIES
NAICS
n/a
SIC 3562: Ball and Roller Bearings
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area
n/a
Annual Production 1,800,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $608,028 12,427,902
kWh
Natural Gas $224,342 53,689
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $90,736 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $760

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2437: Recover waste heat from equipment $1,670 $250 $1,670
70,340
kWh
- -
02 2.7442: Keep doors and windows shut when not on use $1,620 - $1,620
68,288
kWh
- -
03 2.6212: Turn off equipment during breaks, reduce operating time $760 - $760
32,239
kWh
- -
04 2.6232: Install set-back timers $605 $3,500 $605
15,533
kWh
- -
05 3.5314: Use in-process recycling whenever possible $3,840 $3,500 - - $3,840
06 2.2511: Insulate bare equipment $269 $210 - $269
-
MMBtu
-
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $80,900 $4,000 $110,000
2,039,859
kWh
$(-29,100.0)
-
MMBtu
-
08 2.7447: Install vinyl strip / high speed / air curtain doors $1,072 $596 $583
24,619
kWh
$489
-
MMBtu
-
TOTAL RECOMMENDED $90,736 $12,056 $115,238
2,250,878
kWh
$(-28,342.0)
-
MMBtu
$3,840
TOTAL IMPLEMENTED $760 - $760
32,239
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs