ITAC Assessment: UM0146
ITAC logo
ITAC Assessment: UM0146
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Plastic Injection Molding
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 25,000
ft2
Annual Production 36,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,237 2,466,295
kWh
Electricity Demand $47,253 4,140
kW-mo/yr
Electricity Fees $6,763 -
Natural Gas $8,391 1,523
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,263 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (haz) Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,736 $220 $1,935
55,393
kWh
$1,801
-
kW-mo/yr
- - -
02 2.4221: Install compressor air intakes in coolest locations $78 $200 $53
1,465
kWh
$25
-
kW-mo/yr
- - -
03 2.2511: Insulate bare equipment $2,510 $200 $1,655
47,479
kWh
$855
-
kW-mo/yr
- - -
04 2.8114: Change rate schedules or other changes in utility service $15,807 $40,000 - - $15,807 - -
05 3.7131: Use a rag recycle service $925 - - - - $925
-
lb
-
06 4.424: Improve space comfort conditioning $6,000 $3,600 - - - - $6,000
07 4.111: Add equipment/ operators to reduce production bottleneck $11,207 $40,000 - - - - $11,207
TOTAL RECOMMENDED $40,263 $84,220 $3,643
104,337
kWh
$2,681
-
kW-mo/yr
$15,807 $925
-
lb
$17,207
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs