ITAC Assessment: NV0058
ITAC logo
ITAC Assessment: NV0058
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Injection Molded Plastic Parts
NAICS
n/a
SIC 3751: Motorcycles, Bicycles, and Parts
Sales Range $10
M
to 50
M
# of Employees 42
Plant Area 75,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 4,550
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,131 494,431
kWh
Electricity Demand $10,583 1,012
kW-mo/yr
Natural Gas $2,842 392
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,525 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,535

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings
01 2.2511: Insulate bare equipment $3,660 $1,960 $3,660
28,136
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,987 $700 $1,987
15,240
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $632 $170 $632
4,982
kWh
-
04 2.7135: Install occupancy sensors $1,338 $227 $1,338
10,258
kWh
-
05 2.7144: Install spectral reflectors / delamp $3,197 $600 $3,197
24,619
kWh
-
06 3.4151: Minimize water usage $711 $900 - $711
-
Tgal
TOTAL RECOMMENDED $11,525 $4,557 $10,814
83,235
kWh
$711
-
Tgal
TOTAL IMPLEMENTED $4,535 $827 $4,535
34,877
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs