Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,114

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Rolling, drawing, and extruding of nonferrous
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0607 #13 Y:2026 Upgrade obsolete equipment $16,702 $117,000
SU0607 #12 Y:2026 Replace fossil fuel equipment with electrical equipment $75,844 $285,000
SU0607 #11 Y:2026 Use solar heat to make electricty $2,174 $5,654
SU0607 #10 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $2,294 $5,655
SU0607 #09 Y:2026 Conserve energy by efficient use of vending machines $607 $1,271
SU0607 #08 Y:2026 Install vinyl strip / high speed / air curtain doors $1,057 $1,985
SU0607 #07 Y:2026 Use or replace with energy efficient substitutes $489 $708
SU0607 #06 Y:2026 Install compressor air intakes in coolest locations $941 $387
SU0607 #05 Y:2026 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $10,934 $3,466
SU0607 #04 Y:2026 Install / repair insulation on steam lines $4,677 $1,188
SU0607 #03 Y:2026 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $6,197 $1,433
SU0607 #02 Y:2026 Eliminate/reduce an operation $1,725 -
SU0607 #01 Y:2026 Reduce the pressure of compressed air to the minimum required $1,688 -
LT8441 #06 Y:2025 Install equipment (eg compactor) to reduce disposal costs $13,178 $19,400
LT8441 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,016 $245
LT8441 #04 Y:2025 Replace old machine with new automatic multi-station tool $150,000 $2,500,751
LT8441 #03 Y:2025 Install occupancy sensors $2,834 $3,130
LT8441 #02 Y:2025 Use solar heat to make electricty $21,801 $230,294
LT8441 #01 Y:2025 Turn off equipment when not in use $7,201 -
OR0822 #03 Y:2025 Optimize plant power factor $16,211 $80,309