Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Secondary smelting and refining of nonferrous metals
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0584 #06 Y:2022 Use solar heat to make electricty $123,728 $381,839
SF0584 #05 Y:2022 Eliminate or reduce compressed air usage $6,260 $23,959
SF0584 #04 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $8,188 $24,576
SF0584 #03 Y:2022 Utilize higher efficiency lamps and/or ballasts $8,882 $13,939
SF0584 #02 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $5,093 $4,749
SF0584 #01 Y:2022 Reduce space conditioning during non-working hours $9,346 $2,177
LM0125 #04 Y:2007 Use heat in flue gases to preheat products or materials $62,618 $40,000
LM0125 #03 Y:2007 Install equipment to move product $89,704 $11,000
LM0125 #02 Y:2007 Install back-up equipment $20,000 $20,000
LM0125 #01 Y:2007 Utilize higher efficiency lamps and/or ballasts $2,003 $2,604
SD0151 #09 Y:1996 Separate and recycle scrap metal to foundry or for sale $91 $200
SD0151 #08 Y:1996 Use less toxic and volatile solvent substitutes $2,885 $1,450
SD0151 #07 Y:1996 Install occupancy sensors $426 $369
SD0151 #06 Y:1996 Install spectral reflectors / delamp $4,479 $5,640
SD0151 #05 Y:1996 Utilize higher efficiency lamps and/or ballasts $3,509 $3,663
SD0151 #04 Y:1996 Eliminate leaks in inert gas and compressed air lines/ valves $1,233 $440
SD0151 #03 Y:1996 Install timers and/or thermostats $795 $600
SD0151 #02 Y:1996 Replace electrically-operated equipment with fossil fuel equipment $9,302 $13,500
SD0151 #01 Y:1996 Use most efficient type of electric motors $4,415 $4,860