ITAC Assessment: LM0125
ITAC logo
ITAC Assessment: LM0125
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product aluminum ingots
NAICS 331314: Secondary Smelting and Alloying of Aluminum
SIC 3341: Secondary Smelting and Refining of Nonferrous Metals
Sales Range $10
M
to 50
M
# of Employees 20
Plant Area 20,000
ft2
Annual Production 18,000,000
lb
Production Hrs. Annual 5,280
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,169 306,202
kWh
Electricity Demand $16,063 1,054
kW-mo/yr
Electricity Fees $7,148 -
Natural Gas $236,628 26,278
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $174,325 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $91,707

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,003 $2,604 $1,182
12,192
kWh
$821
-
kW-mo/yr
- - -
02 4.651: Install back-up equipment $20,000 $20,000 - - - - $20,000
03 4.445: Install equipment to move product $89,704 $11,000 $2,640
28,509
kWh
- $23,064
-
MMBtu
$64,000 -
04 2.2424: Use heat in flue gases to preheat products or materials $62,618 $40,000 - - $62,618
-
MMBtu
- -
TOTAL RECOMMENDED $174,325 $73,604 $3,822
40,701
kWh
$821
-
kW-mo/yr
$85,682
-
MMBtu
$64,000 $20,000
TOTAL IMPLEMENTED $91,707 $13,604 $3,822
40,701
kWh
$821
-
kW-mo/yr
$23,064
-
MMBtu
$64,000 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs