Assessment Year | 1996 |
---|---|
Principal Product | Low Pressure Water Valves |
NAICS |
n/a
|
SIC | 3341: Secondary Smelting and Refining of Nonferrous Metals |
Sales Range | $10 M to 50M |
# of Employees | 95 |
Plant Area |
42,400
ft2
|
Annual Production | 1,000,000
pieces
|
Production Hrs. Annual | 2,448
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $193,689 | 3,538,980 |
kWh
|
$0.055 |
Electricity Demand | $387,707 | 22,897 |
kW-mo/yr
|
$16.93 |
Electricity Fees | $581,396 | - |
|
- |
Natural Gas | $7,278 | 982 |
MMBtu
|
$7.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,135 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,038 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $4,415 | $4,860 |
$4,415
28,429
kWh
|
- | - | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $9,302 | $13,500 |
$9,302
88,218
kWh
|
- | - | |
03 | 2.7261: Install timers and/or thermostats | $795 | $600 |
$795
16,413
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,233 | $440 |
$1,233
9,086
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,509 | $3,663 |
$3,509
28,429
kWh
|
- | - | |
06 | 2.7144: Install spectral reflectors / delamp | $4,479 | $5,640 |
$4,479
36,342
kWh
|
- | - | |
07 | 2.7135: Install occupancy sensors | $426 | $369 |
$426
3,224
kWh
|
- | - | |
08 | 3.8132: Use less toxic and volatile solvent substitutes | $2,885 | $1,450 | - | - |
$2,885
-
lb
|
|
09 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $91 | $200 | - |
$91
-
lb
|
- | |
TOTAL RECOMMENDED | $27,135 | $30,722 |
$24,159
210,141
kWh
|
$91
-
lb
|
$2,885
-
lb
|
||
TOTAL IMPLEMENTED | $17,038 | $16,622 |
$14,062
105,510
kWh
|
$91
-
lb
|
$2,885
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs