ITAC Assessment: SD0151
ITAC logo
ITAC Assessment: SD0151
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Low Pressure Water Valves
NAICS
n/a
SIC 3341: Secondary Smelting and Refining of Nonferrous Metals
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 42,400
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 2,448
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $193,689 3,538,980
kWh
Electricity Demand $387,707 22,897
kW-mo/yr
Electricity Fees $581,396 -
Natural Gas $7,278 982
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,135 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,038

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings
01 2.4133: Use most efficient type of electric motors $4,415 $4,860 $4,415
28,429
kWh
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $9,302 $13,500 $9,302
88,218
kWh
- -
03 2.7261: Install timers and/or thermostats $795 $600 $795
16,413
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,233 $440 $1,233
9,086
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,509 $3,663 $3,509
28,429
kWh
- -
06 2.7144: Install spectral reflectors / delamp $4,479 $5,640 $4,479
36,342
kWh
- -
07 2.7135: Install occupancy sensors $426 $369 $426
3,224
kWh
- -
08 3.8132: Use less toxic and volatile solvent substitutes $2,885 $1,450 - - $2,885
-
lb
09 3.5248: Separate and recycle scrap metal to foundry or for sale $91 $200 - $91
-
lb
-
TOTAL RECOMMENDED $27,135 $30,722 $24,159
210,141
kWh
$91
-
lb
$2,885
-
lb
TOTAL IMPLEMENTED $17,038 $16,622 $14,062
105,510
kWh
$91
-
lb
$2,885
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs