23
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LE0610 #07 Y:2026 | 07 | 2026 | Replace existing hvac unit with high efficiency model | $51,154 | $342,500 |
n/a
|
| LE0610 #06 Y:2026 | 06 | 2026 | Replace existing chiller with high efficiency model | $116,186 | $277,439 |
n/a
|
| LE0610 #05 Y:2026 | 05 | 2026 | Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $3,210 | $3,880 |
n/a
|
| LE0610 #04 Y:2026 | 04 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $12,801 | $10,000 |
n/a
|
| LE0610 #03 Y:2026 | 03 | 2026 | Repair or replace steam traps | $24,632 | $10,000 |
n/a
|
| LE0610 #02 Y:2026 | 02 | 2026 | Install occupancy sensors | $1,327 | $200 |
n/a
|
| LE0610 #01 Y:2026 | 01 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $44,729 | $4,400 |
n/a
|
| LE0176 #07 Y:2003 | 07 | 2003 | Analyze flue gas for proper air/fuel ratio | $985 | - | |
| LE0176 #06 Y:2003 | 06 | 2003 | Utilize energy-efficient belts and other improved mechanisms | $8,825 | - | |
| LE0176 #05 Y:2003 | 05 | 2003 | Install compressor air intakes in coolest locations | $11,003 | $1,000 | |
| LE0176 #04 Y:2003 | 04 | 2003 | Analyze flue gas for proper air/fuel ratio | $14,480 | $5,000 | |
| LE0176 #03 Y:2003 | 03 | 2003 | Analyze flue gas for proper air/fuel ratio | $19,851 | $1,000 | |
| LE0176 #02 Y:2003 | 02 | 2003 | Preheat combustion air with waste heat | $20,766 | $1,500 | |
| LE0176 #01 Y:2003 | 01 | 2003 | Preheat combustion air with waste heat | $114,214 | $25,000 | |
| HO0216 #09 Y:1999 | 09 | 1999 | Begin a practice of predictive / preventative maintenance | $1,665 | $222 | |
| HO0216 #08 Y:1999 | 08 | 1999 | Use waste heat from hot flue gases to preheat | $10,726 | $4,167 | |
| HO0216 #07 Y:1999 | 07 | 1999 | Insulate bare equipment | $49,535 | $11,088 | |
| HO0216 #06 Y:1999 | 06 | 1999 | Turn off equipment when not in use | $4,569 | - | |
| HO0216 #05 Y:1999 | 05 | 1999 | Use most efficient type of electric motors | $9,645 | $10,005 | |
| HO0216 #04 Y:1999 | 04 | 1999 | Install occupancy sensors | $11,898 | $5,000 |