Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Secondary smelting and refining of nonferrous
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0610 #07 Y:2026 Replace existing hvac unit with high efficiency model $51,154 $342,500
LE0610 #06 Y:2026 Replace existing chiller with high efficiency model $116,186 $277,439
LE0610 #05 Y:2026 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $3,210 $3,880
LE0610 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $12,801 $10,000
LE0610 #03 Y:2026 Repair or replace steam traps $24,632 $10,000
LE0610 #02 Y:2026 Install occupancy sensors $1,327 $200
LE0610 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $44,729 $4,400
LE0176 #07 Y:2003 Analyze flue gas for proper air/fuel ratio $985 -
LE0176 #06 Y:2003 Utilize energy-efficient belts and other improved mechanisms $8,825 -
LE0176 #05 Y:2003 Install compressor air intakes in coolest locations $11,003 $1,000
LE0176 #04 Y:2003 Analyze flue gas for proper air/fuel ratio $14,480 $5,000
LE0176 #03 Y:2003 Analyze flue gas for proper air/fuel ratio $19,851 $1,000
LE0176 #02 Y:2003 Preheat combustion air with waste heat $20,766 $1,500
LE0176 #01 Y:2003 Preheat combustion air with waste heat $114,214 $25,000
HO0216 #09 Y:1999 Begin a practice of predictive / preventative maintenance $1,665 $222
HO0216 #08 Y:1999 Use waste heat from hot flue gases to preheat $10,726 $4,167
HO0216 #07 Y:1999 Insulate bare equipment $49,535 $11,088
HO0216 #06 Y:1999 Turn off equipment when not in use $4,569 -
HO0216 #05 Y:1999 Use most efficient type of electric motors $9,645 $10,005
HO0216 #04 Y:1999 Install occupancy sensors $11,898 $5,000