Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

135

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Primary smelting and refining of nonferrous metals, except copper and aluminum
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0256 #04 Y:2024 Reduce excessive boiler blowdown $5,024 $7,960
UU0256 #03 Y:2024 Use heat from boiler blowdown to preheat boiler feed water $8,048 $11,730
UU0256 #02 Y:2024 Optimize plant power factor $14,319 $31,625
UU0256 #01 Y:2024 Use / purchase optimum sized compressor $43,875 $401,481
MA0827 #07 Y:2021 Insulate bare equipment $801 $1,550
MA0827 #06 Y:2021 Minimize water usage $1,374 $3,230
MA0827 #05 Y:2021 Use cooling tower or economizer to replace chiller cooling $2,962 $10,800
MA0827 #04 Y:2021 Meter recycled water (to reduce sewer charges) $5,685 $2,000
MA0827 #03 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $6,022 $11,050
MA0827 #02 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $18,909 $26,950
MA0827 #01 Y:2021 Use waste heat from hot flue gases to preheat $32,062 $75,000
UU0177 #10 Y:2021 Install occupancy sensors $1,441 $1,625
UU0177 #09 Y:2021 Lower temperature during the winter season and vice-versa $1,497 $100
UU0177 #08 Y:2021 Reduce ventilation air $4,129 $4,000
UU0177 #07 Y:2021 Utilize higher efficiency lamps and/or ballasts $8,105 $11,650
UU0177 #06 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $8,132 $22,614
UU0177 #05 Y:2021 Optimize plant power factor $10,455 $14,250
UU0177 #04 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $12,515 $5,046
UU0177 #03 Y:2021 Use radiant heater for spot heating $32,792 $101,000
UU0177 #02 Y:2021 Reschedule plant operations or reduce load to avoid peaks $36,240 $6,760