ITAC Assessment: UU0177
ITAC logo
ITAC Assessment: UU0177
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Refined Metal Ingots
NAICS 331410: Nonferrous Metal (except Aluminum) Smelting and Refining
SIC 3339: Primary Smelting and Refining of Nonferrous Metals, Except Copper and Aluminum
Sales Range $100
M
to 500
M
# of Employees 120
Plant Area 66,700
ft2
Annual Production 550
ton
Production Hrs. Annual 8,400
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $482,402 12,835,200
kWh
Electricity Demand $515,115 28,428
kW-mo/yr
Electricity Fees $46,318 -
Natural Gas $163,550 37,340
MMBtu
Waste Disposal Costs
Water Usage $46,560 8,000
Tgal
Solid Waste (haz) $10,000 37,787
lb
TOTAL YEARLY COSTS $1,263,945
RECOMMENDED SAVINGS* $173,012 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $72,940

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $57,706 $128,174 $34,179
909,510
kWh
$23,527
-
kW-mo/yr
- -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $36,240 $6,760 - $36,240
-
kW-mo/yr
- -
03 2.7231: Use radiant heater for spot heating $32,792 $101,000 - - - $32,792
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,515 $5,046 $7,413
197,114
kWh
$5,102
-
kW-mo/yr
- -
05 2.3212: Optimize plant power factor $10,455 $14,250 - - $10,455 -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,132 $22,614 $8,132
216,389
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $8,105 $11,650 $4,799
127,712
kWh
$3,305
-
kW-mo/yr
- -
08 2.7314: Reduce ventilation air $4,129 $4,000 $330
8,780
kWh
- - $3,799
-
MMBtu
09 2.7221: Lower temperature during the winter season and vice-versa $1,497 $100 $113
3,000
kWh
- - $1,384
-
MMBtu
10 2.7135: Install occupancy sensors $1,441 $1,625 $1,441
38,342
kWh
- - -
TOTAL RECOMMENDED $173,012 $295,219 $56,407
1,500,847
kWh
$68,175
-
kW-mo/yr
$10,455 $37,975
-
MMBtu
TOTAL IMPLEMENTED $72,940 $41,806 $12,655
336,606
kWh
$44,648
-
kW-mo/yr
$10,455 $5,183
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs