ITAC Assessment: MA0827
ITAC logo
ITAC Assessment: MA0827
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Precious Metals
NAICS 331410: Nonferrous Metal (except Aluminum) Smelting and Refining
SIC 3339: Primary Smelting and Refining of Nonferrous Metals, Except Copper and Aluminum
Sales Range $10
M
to 50
M
# of Employees 106
Plant Area 61,000
ft2
Annual Production 1,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $619,375 5,967,000
kWh
Electricity Demand $264,628 18,492
kW-mo/yr
Electricity Fees $(-86,001.0) -
Natural Gas $188,672 28,962
MMBtu
Waste Disposal Costs
Water Usage $25,021 4,598
Tgal
Water Disposal $27,489 4,598
Tgal
TOTAL YEARLY COSTS $1,039,184
RECOMMENDED SAVINGS* $67,815 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,594

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings
01 2.2414: Use waste heat from hot flue gases to preheat $32,062 $75,000 - - $18,246
-
MMBtu
$6,583
-
Tgal
$7,233
-
Tgal
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $18,909 $26,950 $18,909
181,821
kWh
- - - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,022 $11,050 $6,022
57,907
kWh
- - - -
04 3.4116: Meter recycled water (to reduce sewer charges) $5,685 $2,000 - - - - $5,685
-
Tgal
05 2.2614: Use cooling tower or economizer to replace chiller cooling $2,962 $10,800 $1,116
10,731
kWh
$1,846
-
kW-mo/yr
- - -
06 3.4151: Minimize water usage $1,374 $3,230 - - - $655
-
Tgal
$719
-
Tgal
07 2.2511: Insulate bare equipment $801 $1,550 - - $801
-
MMBtu
- -
TOTAL RECOMMENDED $67,815 $130,580 $26,047
250,459
kWh
$1,846
-
kW-mo/yr
$19,047
-
MMBtu
$7,238
-
Tgal
$13,637
-
Tgal
TOTAL IMPLEMENTED $24,594 $28,950 $18,909
181,821
kWh
- - - $5,685
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs