Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

628

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Steel foundries, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0619 #07 Y:2026 Install spectral reflectors / delamp $345 $563
AS0619 #06 Y:2026 Reduce space conditioning during non-working hours $1,638 $94
AS0619 #05 Y:2026 Utilize energy-efficient belts and other improved mechanisms $3,570 $4,064
AS0619 #04 Y:2026 Replace existing equipment with more suitable substitutes $10,148 $419
AS0619 #03 Y:2026 Replace fossil fuel equipment with electrical equipment $22,021 $900
AS0619 #02 Y:2026 Use solar heat to make electricty $63,128 $634,056
AS0619 #01 Y:2026 Replace existing equipment with more suitable substitutes $507,698 $1,200,000
WM0245 #04 Y:2025 Install compressor air intakes in coolest locations $3,572 $2,170
WM0245 #03 Y:2025 Replace hydraulic / pneumatic equipment with electric equipment $13,265 $4,125
WM0245 #02 Y:2025 Reschedule plant operations or reduce load to avoid peaks $65,152 -
WM0245 #01 Y:2025 Use or replace with energy efficient substitutes $92,428 $550,000
LE0596 #12 Y:2025 Use heat pump for space conditioning $3,616 $14,943
LE0596 #11 Y:2025 Burn a less expensive grade of fuel $49,500 $160,000
LE0596 #10 Y:2025 Install equipment to utilize waste fuel $90,409 $240,000
LE0596 #09 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $5,935 $14,078
LE0596 #08 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $11,365 $24,074
LE0596 #07 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $24,044 $45,000
LE0596 #06 Y:2025 Install occupancy sensors $702 $660
LE0596 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $6,423 $5,658
LE0596 #04 Y:2025 Install compressor air intakes in coolest locations $10,210 $8,000