Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

617

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Steel foundries, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0596 #12 Y:2025 Use heat pump for space conditioning $3,616 $14,943
LE0596 #11 Y:2025 Burn a less expensive grade of fuel $49,500 $160,000
LE0596 #10 Y:2025 Install equipment to utilize waste fuel $90,409 $240,000
LE0596 #09 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $5,935 $14,078
LE0596 #08 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $11,365 $24,074
LE0596 #07 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $24,044 $45,000
LE0596 #06 Y:2025 Install occupancy sensors $702 $660
LE0596 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $6,423 $5,658
LE0596 #04 Y:2025 Install compressor air intakes in coolest locations $10,210 $8,000
LE0596 #03 Y:2025 Re-use or recycle hot or cold process exhaust air $26,110 $14,500
LE0596 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $4,874 $2,600
LE0596 #01 Y:2025 Install timers and/or thermostats $7,008 $2,000
IP0205 #09 Y:2024 Install occupancy sensors $1,388 $3,150
IP0205 #08 Y:2024 Use most efficient type of electric motors $30,273 $56,876
IP0205 #07 Y:2024 Utilize higher efficiency lamps and/or ballasts $5,645 $7,496
IP0205 #06 Y:2024 Recover waste heat from equipment $46,331 $50,406
IP0205 #05 Y:2024 Install compressor air intakes in coolest locations $1,100 $872
IP0205 #04 Y:2024 Improve air circulation with destratification fans / other methods $27,000 $2,636
IP0205 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $16,693 $523
IP0205 #02 Y:2024 Turn off equipment when not in use $21,763 -