| Assessment Year | 2025 |
|---|---|
| Principal Product | Steel Castings |
| NAICS | 331513: Steel Foundries (except Investment) |
| SIC | 3325: Steel Foundries, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 118 |
| Plant Area |
300,000
ft2
|
| Annual Production | 2,000
ton
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $451,795 | 8,010,057 |
kWh
|
$0.056 | |
| Electricity Demand | $244,559 | 14,722 |
kW-mo/yr
|
$16.61 | |
| Electricity Fees | $293,492 | - |
|
- | |
| Natural Gas | $383,583 | 87,309 |
MMBtu
|
$4.39 | |
| Waste Disposal Costs | |||||
| Water Usage | $82,486 | 6,916 |
Tgal
|
$11.93 | |
| TOTAL YEARLY COSTS | $1,455,915 | ||||
| RECOMMENDED SAVINGS* | $174,417 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4322: Use or replace with energy efficient substitutes | $92,428 | $550,000 |
$22,428
400,503
kWh
|
- | $70,000 | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $65,152 | - | - |
$65,152
-
kW-mo/yr
|
- | |
| 03 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $13,265 | $4,125 |
$4,892
87,360
kWh
|
$8,372
-
kW-mo/yr
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $3,572 | $2,170 |
$2,540
45,352
kWh
|
$1,032
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $174,417 | $556,295 |
$29,860
533,215
kWh
|
$74,557
-
kW-mo/yr
|
$70,000 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs