ITAC Assessment: WM0245
ITAC logo
ITAC Assessment: WM0245
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Steel Castings
NAICS 331513: Steel Foundries (except Investment)
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 118
Plant Area 300,000
ft2
Annual Production 2,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $451,795 8,010,057
kWh
Electricity Demand $244,559 14,722
kW-mo/yr
Electricity Fees $293,492 -
Natural Gas $383,583 87,309
MMBtu
Waste Disposal Costs
Water Usage $82,486 6,916
Tgal
TOTAL YEARLY COSTS $1,455,915
RECOMMENDED SAVINGS* $174,417 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.4322: Use or replace with energy efficient substitutes $92,428 $550,000 $22,428
400,503
kWh
- $70,000
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $65,152 - - $65,152
-
kW-mo/yr
-
03 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $13,265 $4,125 $4,892
87,360
kWh
$8,372
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $3,572 $2,170 $2,540
45,352
kWh
$1,032
-
kW-mo/yr
-
TOTAL RECOMMENDED $174,417 $556,295 $29,860
533,215
kWh
$74,557
-
kW-mo/yr
$70,000
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs