Assessment Year | 1996 |
---|---|
Principal Product | Pipe Coatings |
NAICS |
n/a
|
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
25,000
ft2
|
Annual Production | 30,000
ton
|
Production Hrs. Annual | 2,860
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $117,102 | 2,272,274 |
kWh
|
$0.052 |
Electricity Demand | $1,232 | 22,129 |
kW-mo/yr
|
$0.056 |
Electricity Fees | $600 | - |
|
- |
Natural Gas | $29,523 | 7,608 |
MMBtu
|
$3.88 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,196 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,578 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.8314: Purchase high materials in returnable bulk containers | $6,013 | - | - | - |
$1,437
-
lb
|
$4,576 | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,222 | $11,250 |
$3,222
60,961
kWh
|
- | - | - | |
03 | 2.7261: Install timers and/or thermostats | $1,125 | $620 | - |
$1,125
-
MMBtu
|
- | - | |
04 | 2.7241: Install outside air damper / economizer on hvac unit | $420 | $1,300 |
$420
7,913
kWh
|
- | - | - | |
05 | 2.7144: Install spectral reflectors / delamp | $396 | $35 |
$396
7,620
kWh
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $20 | $30 |
$20
1,465
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $11,196 | $13,235 |
$4,058
77,959
kWh
|
$1,125
-
MMBtu
|
$1,437
-
lb
|
$4,576 | ||
TOTAL IMPLEMENTED | $7,578 | $1,950 |
$440
9,378
kWh
|
$1,125
-
MMBtu
|
$1,437
-
lb
|
$4,576 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs