ITAC Assessment: OK0500
ITAC logo
ITAC Assessment: OK0500
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Pipe Coatings
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 25,000
ft2
Annual Production 30,000
ton
Production Hrs. Annual 2,860
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,102 2,272,274
kWh
Electricity Demand $1,232 22,129
kW-mo/yr
Electricity Fees $600 -
Natural Gas $29,523 7,608
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,196 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,578

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 3.8314: Purchase high materials in returnable bulk containers $6,013 - - - $1,437
-
lb
$4,576
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,222 $11,250 $3,222
60,961
kWh
- - -
03 2.7261: Install timers and/or thermostats $1,125 $620 - $1,125
-
MMBtu
- -
04 2.7241: Install outside air damper / economizer on hvac unit $420 $1,300 $420
7,913
kWh
- - -
05 2.7144: Install spectral reflectors / delamp $396 $35 $396
7,620
kWh
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20 $30 $20
1,465
kWh
- - -
TOTAL RECOMMENDED $11,196 $13,235 $4,058
77,959
kWh
$1,125
-
MMBtu
$1,437
-
lb
$4,576
TOTAL IMPLEMENTED $7,578 $1,950 $440
9,378
kWh
$1,125
-
MMBtu
$1,437
-
lb
$4,576
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs