Assessment Year | 2021 |
---|---|
Principal Product | Treated Wastewater |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | less than $500 k |
# of Employees | 55 |
Plant Area |
150,000
ft2
|
Annual Production | 3,175,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $599,778 | 14,371,640 |
kWh
|
$0.042 |
Electricity Demand | $202,475 | 35,213 |
kW-mo/yr
|
$5.75 |
Electricity Fees | $53,672 | - |
|
- |
TOTAL YEARLY COSTS | $855,925 | |||
RECOMMENDED SAVINGS* | $1,543,859 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,147 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #1 Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.9141: Install anaerobic digester | $867,097 | $4,989,249 | - | - |
$347,834
-
MMBtu
|
- | $43,703 | $475,560 | |
02 | 3.5313: Increase amount of waste recovered for resale | $671,615 | $272,000 | - | - | - | $(-20,426.0) | $435,263 | $256,778 | |
03 | 2.7232: Replace existing hvac unit with high efficiency model | $3,608 | $15,087 |
$2,843
67,694
kWh
|
$765
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $716 | $2,286 |
$447
10,651
kWh
|
$84
-
kW-mo/yr
|
- | - | $185 | - | |
05 | 2.7243: Improve air circulation with destratification fans / other methods | $634 | $1,834 |
$500
11,897
kWh
|
$134
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.6211: Conserve energy by efficient use of vending machines | $189 | $231 |
$157
3,747
kWh
|
$32
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $1,543,859 | $5,280,687 |
$3,947
93,989
kWh
|
$1,015
-
kW-mo/yr
|
$347,834
-
MMBtu
|
$(-20,426.0) | $479,151 | $732,338 | ||
TOTAL IMPLEMENTED | $5,147 | $19,438 |
$3,947
93,989
kWh
|
$1,015
-
kW-mo/yr
|
- | - | $185 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #1 Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs