68
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Gray and ductile iron foundries | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OK0881 #06 Y:2014 | 06 | 2014 | Use / purchase optimum sized compressor | $1,894 | $7,100 | |
| OK0881 #05 Y:2014 | 05 | 2014 | Reduce the pressure of compressed air to the minimum required | $2,393 | - | |
| OK0881 #04 Y:2014 | 04 | 2014 | Use compressor air filters | $721 | $112 | |
| OK0881 #03 Y:2014 | 03 | 2014 | Recover waste heat from equipment | $891 | $847 | |
| OK0881 #02 Y:2014 | 02 | 2014 | Use or replace with energy efficient substitutes | $1,592 | $3,432 | |
| OK0881 #01 Y:2014 | 01 | 2014 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,989 | $700 | |
| OK0807 #09 Y:2011 | 09 | 2011 | Use cooling air which cools hot work pieces for space heating | $7,260 | $14,928 | |
| OK0807 #08 Y:2011 | 08 | 2011 | Install outside air damper / economizer on hvac unit | $6,163 | $12,100 | |
| OK0807 #07 Y:2011 | 07 | 2011 | Use adjustable frequency drive or multiple speed motors on existing system | $2,980 | $3,757 | |
| OK0807 #06 Y:2011 | 06 | 2011 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,936 | $4,200 | |
| OK0807 #05 Y:2011 | 05 | 2011 | Upgrade controls on compressors | $18,895 | - | |
| OK0807 #04 Y:2011 | 04 | 2011 | Utilize higher efficiency lamps and/or ballasts | $12,927 | $94,677 | |
| OK0807 #03 Y:2011 | 03 | 2011 | Utilize higher efficiency lamps and/or ballasts | $8,179 | $29,929 | |
| OK0807 #02 Y:2011 | 02 | 2011 | Install occupancy sensors | $2,088 | $3,375 | |
| OK0807 #01 Y:2011 | 01 | 2011 | Use adjustable frequency drive or multiple speed motors on existing system | $300,355 | $463,765 | |
| OK0760 #03 Y:2008 | 03 | 2008 | Not found | $2,970 | $1,034 | |
| OK0760 #02 Y:2008 | 02 | 2008 | Not found | $6,623 | $1,000 | |
| OK0760 #01 Y:2008 | 01 | 2008 | Not found | $449,795 | $1,583,250 | |
| OK0623 #11 Y:2001 | 11 | 2001 | Change procedures / equipment / operating conditions | $4,160 | $4,300 | |
| OK0623 #10 Y:2001 | 10 | 2001 | Replace hydraulic / pneumatic equipment with electric equipment | $99,840 | $57,120 |