ITAC Assessment: OK0623
ITAC logo
ITAC Assessment: OK0623
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Casting Parts
NAICS
n/a
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $5
M
to 10
M
# of Employees 180
Plant Area 180,000
ft2
Annual Production 62,400
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $221,987 9,053,307
kWh
Electricity Demand $40,476 7,500
kW-mo/yr
Electricity Fees $1,349 -
Natural Gas $158,260 26,056
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $203,523 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,356

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,052 $6,513 $882
33,280
kWh
$1,030
-
kW-mo/yr
- - $140
02 2.2515: Use optimum thickness insulation $8,776 $550 - - $8,776
-
MMBtu
- -
03 2.6232: Install set-back timers $6,800 $1,035 - - $6,800
-
MMBtu
- -
04 2.2135: Repair and eliminate steam leaks $1,256 $200 $600
24,500
kWh
$756
-
kW-mo/yr
- $(-100.0) -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $614 $245 $64
2,628
kWh
$19
-
kW-mo/yr
- $120 $411
06 2.7491: Insulate glazing, walls, ceilings, and roofs $8,620 $21,240 - - $8,620
-
MMBtu
- -
07 4.424: Improve space comfort conditioning $25,723 $9,332 - - - $25,723 -
08 2.6232: Install set-back timers $4,652 $4,500 - - $4,652
-
MMBtu
- -
09 4.446: Automate finishing process $41,030 $150,000 $(-570.0)
(-23,275)
kWh
- - $41,600 -
10 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $99,840 $57,120 - - - $99,840 -
11 3.1191: Change procedures / equipment / operating conditions $4,160 $4,300 - - - $4,160 -
TOTAL RECOMMENDED $203,523 $255,035 $976
37,133
kWh
$1,805
-
kW-mo/yr
$28,848
-
MMBtu
$171,343 $551
TOTAL IMPLEMENTED $25,356 $33,003 $1,482
57,780
kWh
$1,786
-
kW-mo/yr
$22,048
-
MMBtu
$(-100.0) $140
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs