ITAC Assessment: BD0123
ITAC logo
ITAC Assessment: BD0123
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Fiberglass Boats
NAICS
n/a
SIC 3732: Boat Building and Repairing
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area 23,040
ft2
Annual Production 75
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,820 447,245
kWh
Electricity Demand $5,355 2,142
kW-mo/yr
Electricity Fees $1,182 -
Natural Gas $6,260 1,207
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,868 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,296

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,566 $5,590 $1,414
36,049
kWh
$1,584
-
kW-mo/yr
- - $568 -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,573 $3,500 $3,153
95,545
kWh
$1,051
-
kW-mo/yr
$(-1,631.0)
-
MMBtu
- - -
03 2.4224: Upgrade controls on compressors $1,788 $1,500 $894
22,860
kWh
$894
-
kW-mo/yr
- - - -
04 2.4221: Install compressor air intakes in coolest locations $763 $200 $338
8,499
kWh
$425
-
kW-mo/yr
- - - -
05 2.7135: Install occupancy sensors $714 $400 $343
8,792
kWh
$371
-
kW-mo/yr
- - - -
06 2.4314: Use synthetic lubricant $555 $300 $246
6,155
kWh
$309
-
kW-mo/yr
- - - -
07 3.2123: Convert to high volume low pressure (hvlp) paint guns $44,117 $14,500 - - - - - $44,117
08 3.4151: Minimize water usage $259 $620 - - - $259
-
Tgal
- -
09 4.821: Pay bills on time to avoid late fees $533 - - - - - $533 -
TOTAL RECOMMENDED $54,868 $26,610 $6,388
177,900
kWh
$4,634
-
kW-mo/yr
$(-1,631.0)
-
MMBtu
$259
-
Tgal
$1,101 $44,117
TOTAL IMPLEMENTED $1,296 $200 $338
8,499
kWh
$425
-
kW-mo/yr
- - $533 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs