ITAC Assessment: OK0807
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Municipal Castings
NAICS 331511: Iron Foundries
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 210,000
ft2
Annual Production 60,000
ton
Production Hrs. Annual 4,160
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,006,472 66,336,000
kWh
Electricity Demand $987,154 242,544
kW-mo/yr
Natural Gas $467,237 82,927
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $363,783 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,919

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $300,355 $463,765 $189,838
4,209,258
kWh
$110,518
-
MMBtu
02 2.7135: Install occupancy sensors $2,088 $3,375 $2,088
46,299
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $8,179 $29,929 $8,179
181,359
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $12,927 $94,677 $12,927
286,640
kWh
-
05 2.4224: Upgrade controls on compressors $18,895 - $18,895
418,954
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,936 $4,200 $4,936
109,452
kWh
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,980 $3,757 $2,980
96,887
kWh
-
08 2.7241: Install outside air damper / economizer on hvac unit $6,163 $12,100 $6,163
136,644
kWh
-
09 2.2491: Use cooling air which cools hot work pieces for space heating $7,260 $14,928 - $7,260
-
MMBtu
TOTAL RECOMMENDED $363,783 $626,731 $246,006
5,485,493
kWh
$117,778
-
MMBtu
TOTAL IMPLEMENTED $25,919 $7,575 $25,919
574,705
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs