Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

292

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Cold-rolled steel sheet, strip, and bars
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL2516 #08 Y:2025 Install occupancy sensors $149 $254
UL2516 #07 Y:2025 Utilize higher efficiency lamps and/or ballasts $49,312 $34,242
UL2516 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $3,831 $3,900
UL2516 #05 Y:2025 Use solar heat to make electricty $135,359 $916,268
UL2516 #04 Y:2025 Change rate schedules or other changes in utility service $43,408 -
UL2516 #03 Y:2025 Optimize plant power factor $2,217 $10,400
UL2516 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $15,881 $3,780
UL2516 #01 Y:2025 Reduce the pressure of compressed air to the minimum required $8,018 -
OR0800 #04 Y:2024 Reduce the pressure of compressed air to the minimum required $1,775 $10,104
OR0800 #03 Y:2024 Use solar heat to make electricty $77,631 $300,000
OR0800 #02 Y:2024 Utilize higher efficiency lamps and/or ballasts $4,219 $9,036
OR0800 #01 Y:2024 Minimize operation of equipment maintained in standby condition $5,407 -
AM0938 #06 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $1,360 $10,180
AM0938 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $5,804 $29,010
AM0938 #04 Y:2024 Optimize plant power factor $6,940 $16,200
AM0938 #03 Y:2024 Apply for tax-free status for energy purchases $8,260 $15,000
AM0938 #02 Y:2024 Install desiccant humidity control system $23,487 $32,590
AM0938 #01 Y:2024 Use solar heat to make electricty $213,909 $2,311,826
TT0319 #08 Y:2024 Reduce the pressure of compressed air to the minimum required $497 $32
TT0319 #07 Y:2024 Turn off equipment when not in use $4,402 $3,250