ITAC Assessment: AM0938
ITAC logo
ITAC Assessment: AM0938
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Rolled Steel
NAICS 331221: Rolled Steel Shape Manufacturing
SIC 3316: Cold-Rolled Steel Sheet, Strip, and Bars
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 127,500
ft2
Annual Production 50,000
ton
Production Hrs. Annual 1,520
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,207 625,920
kWh
Electricity Demand $43,394 4,950
kW-mo/yr
Electricity Fees $8,030 -
Natural Gas $380 1
MMBtu
Waste Disposal Costs
Water Usage $15,635 500
Tgal
TOTAL YEARLY COSTS $102,645
RECOMMENDED SAVINGS* $259,760 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $213,909 $2,311,826 $213,909
3,819,815
kWh
- - -
02 2.7273: Install desiccant humidity control system $23,487 $32,590 $15
267
kWh
- - $23,472
03 2.8121: Apply for tax-free status for energy purchases $8,260 $15,000 - - $8,260 -
04 2.3212: Optimize plant power factor $6,940 $16,200 - $6,940
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,804 $29,010 $2,695
50,815
kWh
$1,450
-
kW-mo/yr
$1,659 -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,360 $10,180 $1,360
25,700
kWh
- - -
TOTAL RECOMMENDED $259,760 $2,414,806 $217,979
3,896,597
kWh
$8,390
-
kW-mo/yr
$9,919 $23,472
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs