ITAC Assessment: MI0110
ITAC logo
ITAC Assessment: MI0110
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Asphalt
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 1,000,000
ft2
Annual Production 415,778
ton
Production Hrs. Annual 7,200
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,402 1,450,440
kWh
Electricity Demand $48,178 5,863
kW-mo/yr
Electricity Fees $14,757 -
Natural Gas $1,536,393 903,761
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $294,681 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Gas Savings Administrative Changes Savings
01 2.1116: Improve combustion control capability $122,911 $75,000 - $122,911
-
MMBtu
-
02 2.2136: Install / repair insulation on steam lines $117,785 $2,470 - $117,785
-
MMBtu
-
03 4.111: Add equipment/ operators to reduce production bottleneck $49,464 $16,000 - - $49,464
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,676 $1,110 $3,676
48,911
kWh
- -
05 2.4314: Use synthetic lubricant $845 $780 $845
13,349
kWh
- -
TOTAL RECOMMENDED $294,681 $95,360 $4,521
62,260
kWh
$240,696
-
MMBtu
$49,464
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs