Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Steel works, blast furnaces (including coke ovens), and rolling mills
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0817 #18 Y:2010 Install / repair insulation on steam lines $1,624 $5,686
UD0817 #17 Y:2010 Use radiant heater for spot heating $18,312 $36,624
UD0817 #16 Y:2010 Redesign process $357,330 -
UD0817 #15 Y:2010 Insulate bare equipment $3,996 -
UD0817 #14 Y:2010 Relocate oven / furnace to more efficient location $300 $50
UD0817 #13 Y:2010 Insulate bare equipment $21,893 -
UD0817 #12 Y:2010 Cover open tanks $10,386 -
UD0817 #11 Y:2010 Use optimum temperature $8,137 -
UD0817 #10 Y:2010 Use / purchase optimum sized compressor $3,001 $2,366
UD0817 #09 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $1,120 -
UD0817 #08 Y:2010 Use or replace with energy efficient substitutes $4,696 $2,250
UD0817 #07 Y:2010 Remove or close off unneeded compressed air lines $628 -
UD0817 #06 Y:2010 Utilize daylight whenever possible in lieu of artificial light $1,712 $7,628
UD0817 #05 Y:2010 Utilize higher efficiency lamps and/or ballasts $10,546 $3,000
UD0817 #04 Y:2010 Utilize higher efficiency lamps and/or ballasts $9,364 $1,876
UD0817 #03 Y:2010 Use plant owned transformers or lease transformers $9,387 -
UD0817 #02 Y:2010 Optimize plant power factor $63,586 $41,250
UD0817 #01 Y:2010 Change rate schedules or other changes in utility service $66,672 $600
UD0811 #05 Y:2009 Use adjustable frequency drive or multiple speed motors on existing system $12,579 $50,000
UD0811 #04 Y:2009 Reduce the pressure of compressed air to the minimum required $646 -