58
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Steel works, blast furnaces (including coke ovens), and rolling mills | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD0817 #18 Y:2010 | 18 | 2010 | Install / repair insulation on steam lines | $1,624 | $5,686 | |
| UD0817 #17 Y:2010 | 17 | 2010 | Use radiant heater for spot heating | $18,312 | $36,624 | |
| UD0817 #16 Y:2010 | 16 | 2010 | Redesign process | $357,330 | - | |
| UD0817 #15 Y:2010 | 15 | 2010 | Insulate bare equipment | $3,996 | - | |
| UD0817 #14 Y:2010 | 14 | 2010 | Relocate oven / furnace to more efficient location | $300 | $50 | |
| UD0817 #13 Y:2010 | 13 | 2010 | Insulate bare equipment | $21,893 | - | |
| UD0817 #12 Y:2010 | 12 | 2010 | Cover open tanks | $10,386 | - | |
| UD0817 #11 Y:2010 | 11 | 2010 | Use optimum temperature | $8,137 | - | |
| UD0817 #10 Y:2010 | 10 | 2010 | Use / purchase optimum sized compressor | $3,001 | $2,366 | |
| UD0817 #09 Y:2010 | 09 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,120 | - | |
| UD0817 #08 Y:2010 | 08 | 2010 | Use or replace with energy efficient substitutes | $4,696 | $2,250 | |
| UD0817 #07 Y:2010 | 07 | 2010 | Remove or close off unneeded compressed air lines | $628 | - | |
| UD0817 #06 Y:2010 | 06 | 2010 | Utilize daylight whenever possible in lieu of artificial light | $1,712 | $7,628 | |
| UD0817 #05 Y:2010 | 05 | 2010 | Utilize higher efficiency lamps and/or ballasts | $10,546 | $3,000 | |
| UD0817 #04 Y:2010 | 04 | 2010 | Utilize higher efficiency lamps and/or ballasts | $9,364 | $1,876 | |
| UD0817 #03 Y:2010 | 03 | 2010 | Use plant owned transformers or lease transformers | $9,387 | - | |
| UD0817 #02 Y:2010 | 02 | 2010 | Optimize plant power factor | $63,586 | $41,250 | |
| UD0817 #01 Y:2010 | 01 | 2010 | Change rate schedules or other changes in utility service | $66,672 | $600 | |
| UD0811 #05 Y:2009 | 05 | 2009 | Use adjustable frequency drive or multiple speed motors on existing system | $12,579 | $50,000 | |
| UD0811 #04 Y:2009 | 04 | 2009 | Reduce the pressure of compressed air to the minimum required | $646 | - |