ITAC Assessment: TT0322
ITAC logo
ITAC Assessment: TT0322
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Flat rolled metals processor- carbon steel, stainless steel, aluminum
NAICS 331221: Rolled Steel Shape Manufacturing
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $100
M
to 500
M
# of Employees 55
Plant Area 240,000
ft2
Annual Production 481,819
ton
Production Hrs. Annual 4,250
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $194,246 1,261,200
kWh
Electricity Demand $107,350 4,468
kW-mo/yr
Electricity Fees $5,321 -
Natural Gas $20,528 1,727
MMBtu
LPG $31,509 844
MMBtu
Waste Disposal Costs
Water Usage $1,233 144
Tgal
Water Disposal $3,273 144
Tgal
TOTAL YEARLY COSTS $363,460
RECOMMENDED SAVINGS* $66,066 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $473 $60 $473
3,154
kWh
-
02 2.3212: Optimize plant power factor $16,071 $15,000 - $16,071
03 2.7135: Install occupancy sensors $583 $875 $583
3,885
kWh
-
04 4.721: Initiate a program to acquire iso certification $7,760 $15,000 $7,760
46,664
kWh
-
05 2.9113: Use solar heat for heat $40,764 $113,963 $40,764
271,762
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $415 $1,570 $415
2,700
kWh
-
TOTAL RECOMMENDED $66,066 $146,468 $49,995
328,165
kWh
$16,071
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs