| Assessment Year | 2025 |
|---|---|
| Principal Product | Flat rolled metals processor- carbon steel, stainless steel, aluminum |
| NAICS | 331221: Rolled Steel Shape Manufacturing |
| SIC | 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills |
| Sales Range | $100 M to 500M |
| # of Employees | 55 |
| Plant Area |
240,000
ft2
|
| Annual Production | 481,819
ton
|
| Production Hrs. Annual | 4,250
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $194,246 | 1,261,200 |
kWh
|
$0.15 | |
| Electricity Demand | $107,350 | 4,468 |
kW-mo/yr
|
$24.03 | |
| Electricity Fees | $5,321 | - |
|
- | |
| Natural Gas | $20,528 | 1,727 |
MMBtu
|
$11.89 | |
| LPG | $31,509 | 844 |
MMBtu
|
$37.33 | |
| Waste Disposal Costs | |||||
| Water Usage | $1,233 | 144 |
Tgal
|
$8.59 | |
| Water Disposal | $3,273 | 144 |
Tgal
|
$22.79 | |
| TOTAL YEARLY COSTS | $363,460 | ||||
| RECOMMENDED SAVINGS* | $66,066 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $473 | $60 |
$473
3,154
kWh
|
- | |
| 02 | 2.3212: Optimize plant power factor | $16,071 | $15,000 | - | $16,071 | |
| 03 | 2.7135: Install occupancy sensors | $583 | $875 |
$583
3,885
kWh
|
- | |
| 04 | 4.721: Initiate a program to acquire iso certification | $7,760 | $15,000 |
$7,760
46,664
kWh
|
- | |
| 05 | 2.9113: Use solar heat for heat | $40,764 | $113,963 |
$40,764
271,762
kWh
|
- | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $415 | $1,570 |
$415
2,700
kWh
|
- | |
| TOTAL RECOMMENDED | $66,066 | $146,468 |
$49,995
328,165
kWh
|
$16,071 | ||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs