Assessment Year | 2025 |
---|---|
Principal Product | Flat rolled metals processor- carbon steel, stainless steel, aluminum |
NAICS | 331221: Rolled Steel Shape Manufacturing |
SIC | 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills |
Sales Range | $100 M to 500M |
# of Employees | 55 |
Plant Area |
240,000
ft2
|
Annual Production | 481,819
ton
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $194,246 | 1,261,200 |
kWh
|
$0.15 | |
Electricity Demand | $107,350 | 4,468 |
kW-mo/yr
|
$24.03 | |
Electricity Fees | $5,321 | - |
|
- | |
Natural Gas | $20,528 | 1,727 |
MMBtu
|
$11.89 | |
LPG | $31,509 | 844 |
MMBtu
|
$37.33 | |
Waste Disposal Costs | |||||
Water Usage | $1,233 | 144 |
Tgal
|
$8.59 | |
Water Disposal | $3,273 | 144 |
Tgal
|
$22.79 | |
TOTAL YEARLY COSTS | $363,460 | ||||
RECOMMENDED SAVINGS* | $66,066 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $473 | $60 |
$473
3,154
kWh
|
- | |
02 | 2.3212: Optimize plant power factor | $16,071 | $15,000 | - | $16,071 | |
03 | 2.7135: Install occupancy sensors | $583 | $875 |
$583
3,885
kWh
|
- | |
04 | 4.721: Initiate a program to acquire iso certification | $7,760 | $15,000 |
$7,760
46,664
kWh
|
- | |
05 | 2.9113: Use solar heat for heat | $40,764 | $113,963 |
$40,764
271,762
kWh
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $415 | $1,570 |
$415
2,700
kWh
|
- | |
TOTAL RECOMMENDED | $66,066 | $146,468 |
$49,995
328,165
kWh
|
$16,071 | ||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs