Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

86

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Steel works, blast furnaces, and rolling and finishing mills
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0120 #09 Y:1998 Pay bills on time to avoid late fees $332 -
BD0120 #08 Y:1998 Develop standard procedures to improve internal yields $2,430 $1,000
BD0120 #07 Y:1998 Minimize water usage $1,780 $750
BD0120 #06 Y:1998 Install occupancy sensors $985 $750
BD0120 #05 Y:1998 Install compressor air intakes in coolest locations $1,992 $500
BD0120 #04 Y:1998 Reduce illumination to minimum necessary levels $2,527 $400
BD0120 #03 Y:1998 Use most efficient type of electric motors $3,816 $11,230
BD0120 #02 Y:1998 Install partitions to reduce size of conditioned space $4,250 $4,000
BD0120 #01 Y:1998 Eliminate leaks in inert gas and compressed air lines/ valves $13,459 $600
ND0313 #09 Y:1998 Demolish old building to reduce tax and insurance bills $976 $250
ND0313 #08 Y:1998 Replace cloth rags with paper towels $297 $450
ND0313 #07 Y:1998 Turn off equipment when not in use $67 -
ND0313 #06 Y:1998 Utilize higher efficiency lamps and/or ballasts $515 $825
ND0313 #05 Y:1998 Reduce illumination to minimum necessary levels $6,403 $2,500
ND0313 #04 Y:1998 Install occupancy sensors $838 $400
ND0313 #03 Y:1998 Replace city water with recycled water via cooling tower $2,879 $120
ND0313 #02 Y:1998 Eliminate leaks in inert gas and compressed air lines/ valves $2,421 $160
ND0313 #01 Y:1998 Install compressor air intakes in coolest locations $2,085 $3,000
AR0146 #08 Y:1998 Install automatic packing equipment $98,162 $386,400
AR0146 #07 Y:1998 Purchase re-conditioned material instead of new $3,780 -