ITAC Assessment: BD0120
ITAC logo
ITAC Assessment: BD0120
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product cold drawn steel tubing
NAICS
n/a
SIC 3317: Steel Pipe and Tubes
Sales Range $10
M
to 50
M
# of Employees 89
Plant Area 14,000,000
ft2
Annual Production 14,000
thousand feet
Production Hrs. Annual 7,488
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,337 2,207,503
kWh
Electricity Demand $59,989 4,822
kW-mo/yr
Electricity Fees $561 -
Natural Gas $250,001 80,353
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,571 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,275

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,459 $600 $8,476
250,000
kWh
$4,983
-
kW-mo/yr
- - - -
02 2.7496: Install partitions to reduce size of conditioned space $4,250 $4,000 - - $4,250
-
MMBtu
- - -
03 2.4133: Use most efficient type of electric motors $3,816 $11,230 $2,650
78,253
kWh
$1,166
-
kW-mo/yr
- - - -
04 2.7111: Reduce illumination to minimum necessary levels $2,527 $400 $1,481
43,669
kWh
$909
-
kW-mo/yr
- - - $137
05 2.4221: Install compressor air intakes in coolest locations $1,992 $500 $1,254
36,928
kWh
$738
-
kW-mo/yr
- - - -
06 2.7135: Install occupancy sensors $985 $750 $503
14,947
kWh
$482
-
kW-mo/yr
- - - -
07 3.4151: Minimize water usage $1,780 $750 - - - $1,780
-
Tgal
- -
08 4.122: Develop standard procedures to improve internal yields $2,430 $1,000 - - - - $2,430 -
09 4.821: Pay bills on time to avoid late fees $332 - - - - - - $332
TOTAL RECOMMENDED $31,571 $19,230 $14,364
423,797
kWh
$8,278
-
kW-mo/yr
$4,250
-
MMBtu
$1,780
-
Tgal
$2,430 $469
TOTAL IMPLEMENTED $17,275 $11,830 $11,126
328,253
kWh
$6,149
-
kW-mo/yr
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs