ITAC Assessment: SF0613
ITAC logo
ITAC Assessment: SF0613
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Milk, Yogurt, Ice cream, Butter
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 65,000
ft2
Annual Production 7,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $487,821 3,053,524
kWh
Electricity Demand $195,726 7,931
kW-mo/yr
Electricity Fees $2,928 -
Natural Gas $287,097 19,466
MMBtu
TOTAL YEARLY COSTS $973,572
RECOMMENDED SAVINGS* $226,720 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $4,003 $100 $3,304
20,673
kWh
$699
-
kW-mo/yr
- - -
02 2.7224: Reduce space conditioning during non-working hours $16,636 $2,272 $8,484
53,089
kWh
- $8,152
-
MMBtu
- -
03 2.2113: Repair or replace steam traps $16,386 $2,278 - - $17,686
-
MMBtu
$(-1,300.0) -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $18,117 $3,083 $18,117
113,375
kWh
- - - -
05 2.2123: Insulate feedwater tank $1,576 $1,977 - - $1,576
-
MMBtu
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $466 $1,170 $253
1,581
kWh
$191
-
kW-mo/yr
- $30 $(-8.0)
07 2.2414: Use waste heat from hot flue gases to preheat $17,789 $52,101 - - $17,789
-
MMBtu
- -
08 2.2414: Use waste heat from hot flue gases to preheat $4,505 $22,063 - - $4,505
-
MMBtu
- -
09 2.7243: Improve air circulation with destratification fans / other methods $5,729 $28,430 $5,729
35,854
kWh
- - - -
10 2.9114: Use solar heat to make electricty $141,513 $823,750 $141,513
885,566
kWh
- - - -
TOTAL RECOMMENDED $226,720 $937,224 $177,400
1,110,138
kWh
$890
-
kW-mo/yr
$49,708
-
MMBtu
$(-1,270.0) $(-8.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs