ITAC Assessment: ND0313
ITAC logo
ITAC Assessment: ND0313
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Flat rolled steels
NAICS
n/a
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $100
M
to 500
M
# of Employees 165
Plant Area 240,000
ft2
Annual Production 360,000,000
lb
Production Hrs. Annual 6,816
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $161,445 3,655,334
kWh
Electricity Demand $88,909 8,706
kW-mo/yr
Natural Gas $100,971 23,011
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,481 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4221: Install compressor air intakes in coolest locations $2,085 $3,000 n/a $2,085
30,481
kWh
- - - - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,421 $160 n/a $2,421
45,428
kWh
- - - - - -
03 3.4114: Replace city water with recycled water via cooling tower $2,879 $120 n/a $590
8,499
kWh
- $201
-
Tgal
$2,088
-
gal
- - -
04 2.7135: Install occupancy sensors $838 $400 n/a $838
12,309
kWh
- - - - - -
05 2.7111: Reduce illumination to minimum necessary levels $6,403 $2,500 n/a $4,898
92,028
kWh
$1,505
-
kW-mo/yr
- - - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $515 $825 n/a $197
3,810
kWh
$52
-
kW-mo/yr
- - - - $266
07 2.6218: Turn off equipment when not in use $67 - n/a $67
879
kWh
- - - - - -
08 3.7137: Replace cloth rags with paper towels $297 $450 n/a - - - - $297
-
lb
- -
09 4.811: Demolish old building to reduce tax and insurance bills $976 $250 n/a - - - - - $976 -
TOTAL RECOMMENDED $16,481 $7,705 $11,096
193,434
kWh
$1,557
-
kW-mo/yr
$201
-
Tgal
$2,088
-
gal
$297
-
lb
$976 $266
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs