| Assessment Year | 1998 |
|---|---|
| Principal Product | Nails for Pneumatic Nailers |
| NAICS |
n/a
|
| SIC | 3315: Steel Wiredrawing and Steel Nails and Spikes |
| Sales Range | $10 M to 50M |
| # of Employees | 106 |
| Plant Area |
117,000
ft2
|
| Annual Production | 18,975,119
lb
|
| Production Hrs. Annual | 8,688
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $199,382 | 4,528,722 |
kWh
|
$0.044 |
| Electricity Demand | $38,992 | 9,748 |
kW-mo/yr
|
$4.00 |
| Natural Gas | $14,220 | 2,818 |
MMBtu
|
$5.05 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $398,314 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $381,050 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $6,771 | $840 |
$6,016
136,577
kWh
|
$755
-
kW-mo/yr
|
- | - | - | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $16,850 | $300 |
$14,970
340,270
kWh
|
$1,880
-
kW-mo/yr
|
- | - | - | - | - | |
| 03 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $29,234 | $18,900 |
$29,163
663,247
kWh
|
$71
-
kW-mo/yr
|
- | - | - | - | - | |
| 04 | 2.4133: Use most efficient type of electric motors | $1,398 | $1,340 |
$1,242
28,136
kWh
|
$156
-
kW-mo/yr
|
- | - | - | - | - | |
| 05 | 3.7214: Reduce or eliminate waste | $224,855 | $8,100 | - | - | - |
$11,385
-
lb
|
- | $213,470 | - | |
| 06 | 3.5112: Reprocess spent oils on site for re-use | $17,264 | - | - | - |
$2,500
-
gal
|
- | - | $14,764 | - | |
| 07 | 4.222: Purchase re-conditioned material instead of new | $3,780 | - | - | - | - | - | - | - | $3,780 | |
| 08 | 4.441: Install automatic packing equipment | $98,162 | $386,400 |
$(-5,734.0)
(-130,422)
kWh
|
$(-360.0)
-
kW-mo/yr
|
- | - | $104,256 | - | - | |
| TOTAL RECOMMENDED | $398,314 | $415,880 |
$45,657
1,037,808
kWh
|
$2,502
-
kW-mo/yr
|
$2,500
-
gal
|
$11,385
-
lb
|
$104,256 | $228,234 | $3,780 | ||
| TOTAL IMPLEMENTED | $381,050 | $415,880 |
$45,657
1,037,808
kWh
|
$2,502
-
kW-mo/yr
|
- |
$11,385
-
lb
|
$104,256 | $213,470 | $3,780 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs