ITAC Assessment: AR0146
ITAC logo
ITAC Assessment: AR0146
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Nails for Pneumatic Nailers
NAICS
n/a
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $10
M
to 50
M
# of Employees 106
Plant Area 117,000
ft2
Annual Production 18,975,119
lb
Production Hrs. Annual 8,688
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $199,382 4,528,722
kWh
Electricity Demand $38,992 9,748
kW-mo/yr
Natural Gas $14,220 2,818
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $398,314 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $381,050

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.4221: Install compressor air intakes in coolest locations $6,771 $840 $6,016
136,577
kWh
$755
-
kW-mo/yr
- - - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,850 $300 $14,970
340,270
kWh
$1,880
-
kW-mo/yr
- - - - -
03 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $29,234 $18,900 $29,163
663,247
kWh
$71
-
kW-mo/yr
- - - - -
04 2.4133: Use most efficient type of electric motors $1,398 $1,340 $1,242
28,136
kWh
$156
-
kW-mo/yr
- - - - -
05 3.7214: Reduce or eliminate waste $224,855 $8,100 - - - $11,385
-
lb
- $213,470 -
06 3.5112: Reprocess spent oils on site for re-use $17,264 - - - $2,500
-
gal
- - $14,764 -
07 4.222: Purchase re-conditioned material instead of new $3,780 - - - - - - - $3,780
08 4.441: Install automatic packing equipment $98,162 $386,400 $(-5,734.0)
(-130,422)
kWh
$(-360.0)
-
kW-mo/yr
- - $104,256 - -
TOTAL RECOMMENDED $398,314 $415,880 $45,657
1,037,808
kWh
$2,502
-
kW-mo/yr
$2,500
-
gal
$11,385
-
lb
$104,256 $228,234 $3,780
TOTAL IMPLEMENTED $381,050 $415,880 $45,657
1,037,808
kWh
$2,502
-
kW-mo/yr
- $11,385
-
lb
$104,256 $213,470 $3,780
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs