ITAC Assessment: GT0816
ITAC logo
ITAC Assessment: GT0816
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Corrugated Boxes
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 137,500
ft2
Annual Production 336,759
thousand feet
Production Hrs. Annual 6,864
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $231,548 6,107,115
kWh
Electricity Demand $121,468 13,388
kW-mo/yr
Electricity Fees $26,571 -
Natural Gas $510,783 65,949
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $84,557 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,997

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.2121: Increase amount of condensate returned $15,818 $4,500 - - $15,818
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,467 $7,195 $5,103
135
kWh
$2,364
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,196 $1,422 $1,426
37,890
kWh
$770
-
kW-mo/yr
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,351 $5,122 $4,767
126,785
kWh
$2,584
-
kW-mo/yr
- -
05 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $31,493 $25,500 - - $31,493
-
MMBtu
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,632 $800 $1,825
48,527
kWh
$807
-
kW-mo/yr
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,858 $30,000 $3,604
95,857
kWh
$6,254
-
kW-mo/yr
- -
08 2.8112: Combine utility meters $7,742 $2,000 - - - $7,742
TOTAL RECOMMENDED $84,557 $76,539 $16,725
309,194
kWh
$12,779
-
kW-mo/yr
$47,311
-
MMBtu
$7,742
TOTAL IMPLEMENTED $27,997 $11,844 $8,018
213,202
kWh
$4,161
-
kW-mo/yr
$15,818
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs