Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,560

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Primary metal industries
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MU0068 #13 Y:2025 Use solar heat to make electricty $6,362 $24,413
MU0068 #12 Y:2025 Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $728 $22,678
MU0068 #11 Y:2025 Close holes and openings in building such as broken windows $31 $57
MU0068 #10 Y:2025 Replace existing hvac unit with high efficiency model $6,486 $80,718
MU0068 #09 Y:2025 Utilize higher efficiency lamps and/or ballasts $393 -
MU0068 #08 Y:2025 Install occupancy sensors $1,137 $2,018
MU0068 #07 Y:2025 Turn off equipment during breaks, reduce operating time $1,415 -
MU0068 #06 Y:2025 Use or replace with energy efficient substitutes $585 $3,626
MU0068 #05 Y:2025 Use or replace with energy efficient substitutes $529 -
MU0068 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $972 $26
MU0068 #03 Y:2025 Establish a preventative maintenance program $829 $473
MU0068 #02 Y:2025 Install compressor air intakes in coolest locations $9,526 $9,755
MU0068 #01 Y:2025 Use or replace with energy efficient substitutes $73,104 $121,444
IP0214 #14 Y:2025 Utilize higher efficiency lamps and/or ballasts $15,911 $51,915
IP0214 #13 Y:2025 Replace boiler $29,619 $95,000
IP0214 #12 Y:2025 Standardize motor inventory $23,673 $53,888
IP0214 #11 Y:2025 Recover waste heat from equipment $2,076 $3,485
IP0214 #10 Y:2025 Upgrade conveyors $4,792 $7,500
IP0214 #09 Y:2025 Use radiant heater for spot heating $9,756 $12,559
IP0214 #08 Y:2025 Use fog nozzles / spray rinsing instead of immersion rinsing $9,428 $9,599