ITAC Assessment: ND0361
ITAC logo
ITAC Assessment: ND0361
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Extruded Metal
NAICS
n/a
SIC 3354: Aluminum Extruded Products
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 83,000
ft2
Annual Production 0
lb
Production Hrs. Annual 7,344
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $193,425 5,702,521
kWh
Electricity Demand $84,624 11,405
kW-mo/yr
Electricity Fees $3,411 -
Natural Gas $134,066 31,583
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,941 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,136

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $695 $100 $695
20,516
kWh
- - - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,270 $6,930 $555
16,413
kWh
$715
-
kW-mo/yr
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $606 $750 $125
3,810
kWh
$38
-
kW-mo/yr
- - $219 $224
04 2.8226: Increase efficiency of trucks $2,929 $18,500 $(-404.0)
(-12,016)
kWh
$(-170.0)
-
kW-mo/yr
$(-1,619.0)
-
MMBtu
$5,122
-
MMBtu
- -
05 2.4151: Develop a repair/replace policy $4,112 $41,893 $3,029
89,390
kWh
$1,083
-
kW-mo/yr
- - - -
06 2.4221: Install compressor air intakes in coolest locations $2,329 $400 $1,792
52,755
kWh
$537
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $11,941 $68,573 $5,792
170,868
kWh
$2,203
-
kW-mo/yr
$(-1,619.0)
-
MMBtu
$5,122
-
MMBtu
$219 $224
TOTAL IMPLEMENTED $7,136 $42,393 $5,516
162,661
kWh
$1,620
-
kW-mo/yr
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs