Assessment Year | 2000 |
---|---|
Principal Product | Extruded Metal |
NAICS |
n/a
|
SIC | 3354: Aluminum Extruded Products |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
83,000
ft2
|
Annual Production | 0
lb
|
Production Hrs. Annual | 7,344
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $193,425 | 5,702,521 |
kWh
|
$0.034 |
Electricity Demand | $84,624 | 11,405 |
kW-mo/yr
|
$7.42 |
Electricity Fees | $3,411 | - |
|
- |
Natural Gas | $134,066 | 31,583 |
MMBtu
|
$4.24 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,941 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,136 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $695 | $100 |
$695
20,516
kWh
|
- | - | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,270 | $6,930 |
$555
16,413
kWh
|
$715
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $606 | $750 |
$125
3,810
kWh
|
$38
-
kW-mo/yr
|
- | - | $219 | $224 | |
04 | 2.8226: Increase efficiency of trucks | $2,929 | $18,500 |
$(-404.0)
(-12,016)
kWh
|
$(-170.0)
-
kW-mo/yr
|
$(-1,619.0)
-
MMBtu
|
$5,122
-
MMBtu
|
- | - | |
05 | 2.4151: Develop a repair/replace policy | $4,112 | $41,893 |
$3,029
89,390
kWh
|
$1,083
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $2,329 | $400 |
$1,792
52,755
kWh
|
$537
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $11,941 | $68,573 |
$5,792
170,868
kWh
|
$2,203
-
kW-mo/yr
|
$(-1,619.0)
-
MMBtu
|
$5,122
-
MMBtu
|
$219 | $224 | ||
TOTAL IMPLEMENTED | $7,136 | $42,393 |
$5,516
162,661
kWh
|
$1,620
-
kW-mo/yr
|
- | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs