ITAC Assessment: ND0358
ITAC logo
ITAC Assessment: ND0358
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Aluminum Die Casts
NAICS
n/a
SIC 3365: Aluminum Foundries
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 116,000
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $159,059 10,425,557
kWh
Electricity Demand $253,839 20,996
kW-mo/yr
Natural Gas $222,715 63,195
MMBtu
LPG $15,100 940
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,601 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings
01 2.2442: Preheat combustion air with waste heat $1,922 $8,000 $(-85.0)
(-5,569)
kWh
$(-133.0)
-
kW-mo/yr
$2,140
-
MMBtu
-
02 2.1331: Burn a less expensive grade of fuel $11,307 $39,100 $(-182.0)
(-12,016)
kWh
$(-276.0)
-
kW-mo/yr
$(-3,335.0)
-
MMBtu
$15,100
-
MMBtu
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $164 $400 $139
9,086
kWh
$163
-
kW-mo/yr
$(-138.0)
-
MMBtu
-
04 2.6121: Reduce hot water temperature to the minimum required $67 $30 $67
4,689
kWh
- - -
05 2.4221: Install compressor air intakes in coolest locations $1,996 $300 $842
55,100
kWh
$1,154
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,588 $555 $1,588
104,045
kWh
- - -
07 2.7111: Reduce illumination to minimum necessary levels $1,479 $280 $586
38,394
kWh
$893
-
kW-mo/yr
- -
08 2.7135: Install occupancy sensors $78 $200 $31
2,052
kWh
$47
-
kW-mo/yr
- -
TOTAL RECOMMENDED $18,601 $48,865 $2,986
195,781
kWh
$1,848
-
kW-mo/yr
$(-1,333.0)
-
MMBtu
$15,100
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs