Assessment Year | 2007 |
---|---|
Principal Product | Knit products |
NAICS | 315190: Other Apparel Knitting Mills |
SIC | 2259: Knitting Mills, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 275 |
Plant Area |
250,000
ft2
|
Annual Production | 10,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $678,202 | 14,296,000 |
kWh
|
$0.047 |
Electricity Demand | $393,109 | 34,943 |
kW-mo/yr
|
$11.25 |
Electricity Fees | $38,319 | - |
|
- |
Natural Gas | $1,339,770 | 129,110 |
MMBtu
|
$10.38 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $45,125 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $45,125 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4151: Develop a repair/replace policy | $17,011 | $10,953 |
$11,539
243,225
kWh
|
$5,472
-
kW-mo/yr
|
- | - | - | |
02 | 2.2136: Install / repair insulation on steam lines | $9,457 | $1,526 | - | - |
$9,457
-
MMBtu
|
- | - | |
03 | 2.2135: Repair and eliminate steam leaks | $3,562 | $3,000 | - | - |
$3,562
-
MMBtu
|
- | - | |
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,308 | $2,000 |
$1,174
24,737
kWh
|
$1,134
-
kW-mo/yr
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $654 | $100 |
$1,664
35,078
kWh
|
$790
-
kW-mo/yr
|
- | $(-900.0) | $(-900.0) | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,078 | $20,770 |
$6,838
144,149
kWh
|
$3,240
-
kW-mo/yr
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,055 | $712 |
$1,393
29,370
kWh
|
$662
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $45,125 | $39,061 |
$22,608
476,559
kWh
|
$11,298
-
kW-mo/yr
|
$13,019
-
MMBtu
|
$(-900.0) | $(-900.0) | ||
TOTAL IMPLEMENTED | $45,125 | $39,061 |
$22,608
476,559
kWh
|
$11,298
-
kW-mo/yr
|
$13,019
-
MMBtu
|
$(-900.0) | $(-900.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs