ITAC Assessment: NC0353
ITAC logo
ITAC Assessment: NC0353
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Knit products
NAICS 315190: Other Apparel Knitting Mills
SIC 2259: Knitting Mills, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 275
Plant Area 250,000
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $678,202 14,296,000
kWh
Electricity Demand $393,109 34,943
kW-mo/yr
Electricity Fees $38,319 -
Natural Gas $1,339,770 129,110
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,125 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,125

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4151: Develop a repair/replace policy $17,011 $10,953 $11,539
243,225
kWh
$5,472
-
kW-mo/yr
- - -
02 2.2136: Install / repair insulation on steam lines $9,457 $1,526 - - $9,457
-
MMBtu
- -
03 2.2135: Repair and eliminate steam leaks $3,562 $3,000 - - $3,562
-
MMBtu
- -
04 2.7447: Install vinyl strip / high speed / air curtain doors $2,308 $2,000 $1,174
24,737
kWh
$1,134
-
kW-mo/yr
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $654 $100 $1,664
35,078
kWh
$790
-
kW-mo/yr
- $(-900.0) $(-900.0)
06 2.7142: Utilize higher efficiency lamps and/or ballasts $10,078 $20,770 $6,838
144,149
kWh
$3,240
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,055 $712 $1,393
29,370
kWh
$662
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $45,125 $39,061 $22,608
476,559
kWh
$11,298
-
kW-mo/yr
$13,019
-
MMBtu
$(-900.0) $(-900.0)
TOTAL IMPLEMENTED $45,125 $39,061 $22,608
476,559
kWh
$11,298
-
kW-mo/yr
$13,019
-
MMBtu
$(-900.0) $(-900.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs