ITAC Assessment: KU0123
ITAC logo
ITAC Assessment: KU0123
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product APPLE CIDER
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 8
Plant Area
n/a
Annual Production 15,000
pieces
Production Hrs. Annual 1,300
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,562 36,928
kWh
Natural Gas $740 159
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,469 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $692

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 3.6123: Burn wood by-products for heat $629 - $829
6,741
kWh
- $(-200.0)
02 2.2511: Insulate bare equipment $522 $100 - $522
-
MMBtu
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $14 $20 - $214
-
MMBtu
$(-200.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $126 $295 $126
879
kWh
- -
05 2.7447: Install vinyl strip / high speed / air curtain doors $112 $100 - $112
-
MMBtu
-
06 2.1123: Install automatic stack damper $44 $150 - $44
-
MMBtu
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $22 $5 $22
293
kWh
- -
TOTAL RECOMMENDED $1,469 $670 $977
7,913
kWh
$892
-
MMBtu
$(-400.0)
TOTAL IMPLEMENTED $692 $370 - $892
-
MMBtu
$(-200.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs