Assessment Year | 2024 |
---|---|
Principal Product | Cast iron and steel parts |
NAICS | 331511: Iron Foundries |
SIC | 3321: Gray and Ductile Iron Foundries |
Sales Range | $1 M to 5M |
# of Employees | 10 |
Plant Area |
30,000
ft2
|
Annual Production | 624,000
lb
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $73,258 | 515,830 |
kWh
|
$0.14 |
Electricity Demand | $38,852 | 8,439 |
kW-mo/yr
|
$4.60 |
Natural Gas | $8,511 | 477 |
MMBtu
|
$17.84 |
Fuel Oil #1 | $7,123 | 173 |
MMBtu
|
$41.24 |
TOTAL YEARLY COSTS | $127,744 | |||
RECOMMENDED SAVINGS* | $94,600 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #1 Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $246 | $305 |
$207
1,456
kWh
|
$39
-
kW-mo/yr
|
- | - | - | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $641 | $72 |
$641
4,512
kWh
|
- | - | - | - | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $585 | - |
$535
3,764
kWh
|
$50
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $11,572 | $10,571 |
$9,750
68,660
kWh
|
$1,822
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 2.7311: Ventilation system to shut off when room is not in use | $253 | $332 |
$213
1,499
kWh
|
$40
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 2.6218: Turn off equipment when not in use | $4,178 | $54 | - | - |
$4,178
-
MMBtu
|
- | - | - | - | |
07 | 2.4133: Use most efficient type of electric motors | $747 | $6,433 |
$629
4,428
kWh
|
$118
-
kW-mo/yr
|
- | - | - | - | - | |
08 | 3.5221: Recycle casting sand | $75,618 | $775,000 | - | - | - |
$7,123
-
MMBtu
|
$29,900 | $(-1,185.0) | $39,780 | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $760 | $1,897 |
$748
5,267
kWh
|
$12
-
kW-mo/yr
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $94,600 | $794,664 |
$12,723
89,586
kWh
|
$2,081
-
kW-mo/yr
|
$4,178
-
MMBtu
|
$7,123
-
MMBtu
|
$29,900 | $(-1,185.0) | $39,780 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #1 Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs