Assessment Year | 2008 |
---|---|
Principal Product | Air filtration systems |
NAICS | 333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing |
SIC | 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment |
Sales Range | $50 M to 100M |
# of Employees | 208 |
Plant Area |
160,000
ft2
|
Annual Production | 63
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $232,322 | 3,287,270 |
kWh
|
$0.071 |
Natural Gas | $183,584 | 19,692 |
MMBtu
|
$9.32 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $54,305 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,287 | $11,165 |
$5,167
111,386
kWh
|
$2,120
-
kW-mo/yr
|
- | |
02 | 2.7135: Install occupancy sensors | $1,378 | $1,694 |
$1,378
29,709
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $966 | $725 |
$719
15,473
kWh
|
$247
-
kW-mo/yr
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $738 | $65 |
$550
11,856
kWh
|
$188
-
kW-mo/yr
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,020 | $820 |
$765
16,484
kWh
|
$255
-
kW-mo/yr
|
- | |
06 | 2.4239: Eliminate or reduce compressed air usage | $3,859 | $3,040 |
$3,859
83,162
kWh
|
- | - | |
07 | 2.2514: Cover open tanks | $1,164 | $2,525 |
$1,164
25,080
kWh
|
- | - | |
08 | 2.7243: Improve air circulation with destratification fans / other methods | $7,989 | $18,000 | - | - |
$7,989
-
MMBtu
|
|
09 | 2.1133: Adjust burners for efficient operation | $14,857 | $3,120 | - | - |
$14,857
-
MMBtu
|
|
10 | 2.2522: Isolate hot or cold equipment | $15,047 | $1,869 | - | - |
$15,047
-
MMBtu
|
|
TOTAL RECOMMENDED | $54,305 | $43,023 |
$13,602
293,150
kWh
|
$2,810
-
kW-mo/yr
|
$37,893
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs