Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

259

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Nonclay refractories
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL2411 #06 Y:2024 Use waste heat from hot flue gases to preheat $35,308 $50,000
UL2411 #05 Y:2024 Reschedule plant operations or reduce load to avoid peaks $5,372 $5,000
UL2411 #04 Y:2024 Use insulation in furnaces to facilitate heating / cooling $4,053 $13,653
UL2411 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,717 $1,995
UL2411 #02 Y:2024 Lower temperature during the winter season and vice-versa $746 $2,700
UL2411 #01 Y:2024 Use solar heat to make electricty $76,606 $698,579
SU0546 #04 Y:2023 Install / repair insulation on steam lines $559 $253
SU0546 #03 Y:2023 Utilize higher efficiency lamps and/or ballasts $6,466 $100
SU0546 #02 Y:2023 Eliminate or reduce compressed air usage $626 -
SU0546 #01 Y:2023 Recharge batteries on during off-peak demand periods $2,882 -
SU0509 #12 Y:2021 Conserve energy by efficient use of vending machines $199 $413
SU0509 #11 Y:2021 Install / repair insulation on steam lines $51 $85
SU0509 #10 Y:2021 Eliminate/reduce an operation $1,433 $2,000
SU0509 #09 Y:2021 Reduce the pressure of compressed air to the minimum required $1,341 $1,479
SU0509 #08 Y:2021 Utilize higher efficiency lamps and/or ballasts $10,797 $10,808
SU0509 #07 Y:2021 Utilize higher efficiency lamps and/or ballasts $478 $485
SU0509 #06 Y:2021 Install vinyl strip / high speed / air curtain doors $1,401 $327
SU0509 #05 Y:2021 Use or replace with energy efficient substitutes $332 $35
SU0509 #04 Y:2021 Reduce ventilation air $6,046 $882
SU0509 #03 Y:2021 Reduce space conditioning during non-working hours $46 -