ITAC Assessment: SU0546
ITAC logo
ITAC Assessment: SU0546
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Nitrogen bonded silicon carbide products
NAICS 327120: Clay Building Material and Refractories Manufacturing
SIC 3297: Nonclay Refractories
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area 30,260
ft2
Annual Production 25,000
units
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,035 1,281,077
kWh
Electricity Demand $43,906 4,608
kW-mo/yr
Electricity Fees $3,858 -
Natural Gas $5,674 1,079
MMBtu
Waste Disposal Costs
Water Usage $276 65
Tgal
Solid Waste (non-haz) $15,992 9,400
lb
TOTAL YEARLY COSTS $155,741
RECOMMENDED SAVINGS* $10,534 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.3132: Recharge batteries on during off-peak demand periods $2,882 - - - - $2,882
02 2.4239: Eliminate or reduce compressed air usage $626 - $626
9,350
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,466 $100 $129
1,927
kWh
$25
-
kW-mo/yr
- $6,312
04 2.2136: Install / repair insulation on steam lines $559 $253 - - $559
-
MMBtu
-
TOTAL RECOMMENDED $10,534 $353 $756
11,277
kWh
$25
-
kW-mo/yr
$559
-
MMBtu
$9,194
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs