ITAC Assessment: SU0509
ITAC logo
ITAC Assessment: SU0509
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Fused Cast Refractories
NAICS 327120: Clay Building Material and Refractories Manufacturing
SIC 3297: Nonclay Refractories
Sales Range $50
M
to 100
M
# of Employees 130
Plant Area 300,600
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $911,114 14,092,597
kWh
Electricity Demand $1 50,379
kW-mo/yr
Electricity Fees $7,211 -
Natural Gas $183,094 50,267
MMBtu
Waste Disposal Costs
Water Usage $8,760 1,200,000
Tgal
TOTAL YEARLY COSTS $1,110,180
RECOMMENDED SAVINGS* $26,075 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7122: Disconnect ballasts $3,507 - $3,507
53,949
kWh
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $443 - $443
7,536
kWh
- - -
03 2.7224: Reduce space conditioning during non-working hours $46 - - $46
-
MMBtu
- -
04 2.7314: Reduce ventilation air $6,046 $882 $2,380
36,616
kWh
$3,666
-
MMBtu
- -
05 2.4322: Use or replace with energy efficient substitutes $332 $35 $437
6,720
kWh
$(-104.4)
-
MMBtu
- -
06 2.7447: Install vinyl strip / high speed / air curtain doors $1,401 $327 - $1,401
-
MMBtu
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $478 $485 $268
4,117
kWh
- $109 $101
08 2.7142: Utilize higher efficiency lamps and/or ballasts $10,797 $10,808 $8,702
133,870
kWh
- - $2,096
09 2.4231: Reduce the pressure of compressed air to the minimum required $1,341 $1,479 $1,341
20,634
kWh
- - -
10 3.1161: Eliminate/reduce an operation $1,433 $2,000 $36
550
kWh
- - $1,397
11 2.2136: Install / repair insulation on steam lines $51 $85 - $51
-
MMBtu
- -
12 2.6211: Conserve energy by efficient use of vending machines $199 $413 $199
3,066
kWh
- - -
TOTAL RECOMMENDED $26,075 $16,514 $17,313
267,058
kWh
$5,060
-
MMBtu
$109 $3,594
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs